SAP SD Questions

Q:

Which of the following statements about pro forma invoices are correct?

A. In copying control for proforma invoices, the quantity/value plus/minus field is not configurable

B. Account determination procedure is assigned to a proforma invoice

C. In copying control for proforma invoices, the quantity/value plus/minus field must be set to "plus"

D. Account determination procedure is always not assigned to a proforma invoice

Answer

Answer : A , D

Report Error

View answer Workspace Report Error Discuss

0 1478
Q:

In free goods determination which of the following does the system use?

A. Sales document type

B. Sales area

C. Item category

D. Sold-to party

Answer

Answer : A , B , D

Report Error

View answer Workspace Report Error Discuss

1 1283
Q:

The system does a forward scheduling if...

A. Material availability date falls ater today's date

B. If backward scheduling is configured

C. Material availability date falls beyond today's date

D. If backward scheduling is not configured

Answer

Answer : C , D

Report Error

View answer Workspace Report Error Discuss

0 1133
Q:

Which of the following statements about VPRS(cost) are correct?

A. It is controled by the customer master

B. A condition type VPRS is a statistical condition type

C. A condition record can be created for a condition type VPRS (cost)

D. It is controled by the material master

Answer

Answer : B

Report Error

View answer Workspace Report Error Discuss

0 1002
Q:

A sales area is composed of...

A. Division

B. Sales organization

C. Distribution channel

D. Plant

Answer

Answer : A , B , C

Report Error

View answer Workspace Report Error Discuss

0 916