Questions

Q:

What is a requirement to connect a V6R1 IBM i host to an XIV Storage System?

A) XIV firmware V10.0.8 B) Host Attachment Kit V1.0.1
C) SAN Volume Controller (SVC)V4.2 D) Virtual I/O Server (VIOS) V2.1.1
 
Answer & Explanation Answer: D) Virtual I/O Server (VIOS) V2.1.1

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: IBM Certification

1 2161
Q:

Where is a hub specified in the OSI model?

A) Data link layer B) Session layer
C) Application Layer D) Physical layer
 
Answer & Explanation Answer: D) Physical layer

Explanation:

Hubs are specified or operate at Layer1 i.e, the physical layer in the OSI model. Hubs regenerate electrical signals. A hub sends data packets (frames) to all devices on a network, regardless of any MAC addresses contained in the data packet.

Report Error

View Answer Report Error Discuss

Filed Under: Networking
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

0 2161
Q:

PAS  is a drug used in the treatment of 

A) tuberculosis B) Cancer
C) typhoid D) malaria
 
Answer & Explanation Answer: A) tuberculosis

Explanation:

Para-amino salicyclic acid (PAS) is used in the treatment of Tuberculosis.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry

0 2160
Q:

What is the main ingredient in face powder?

A) Calcium carbonate B) Talc
C) Magnesium carbonate D) China clay
 
Answer & Explanation Answer: B) Talc

Explanation:

Talc or talcum is a clay mineral composed of hydrated magnesium silicate with the chemical formula H2Mg3(SiO3)4 is the main ingredient in face powders that absorbs moisture and oil.

 

It is also called as French Chalk. Other ingredients include Calcium carbonate (chalk), Magnesium carbonate, China clay, starches like rice and potato, zinc oxide,...

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

1 2160
Q:

What is attenuation?

Answer

The degeneration of a signal over distance on a network cable is called attenuation.

Report Error

View answer Workspace Report Error Discuss

Subject: Networking
Job Role: Network Engineer

0 2159
Q:

The term Upari refers to which one of the following?

A) A category of proprietary tenure under the Mughal rule B) A category of tenancy tenure under the Maratha rule
C) A soldier in the Maratha army D) A village headman in the Mughal period.
 
Answer & Explanation Answer: B) A category of tenancy tenure under the Maratha rule

Explanation:

Upari refers to a category of tenancy tenure held under the Maratha Regime.The Government used to assign land to various cultivators for cultivation and getting maximum revenue. The land allotted to original settlers of villages came to be known as Mirasi land whereas the land assigned to the migrant settlers was known as the Upari land.

 

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams

0 2159
Q:

Which tennis player has won the Grand Slam title in men's singles 2019?

A) Rafael Nadal B) Roger Federer
C) Novak DJokovic D) Daniil Medvedev
 
Answer & Explanation Answer: A) Rafael Nadal

Explanation:

Rafael Nadal defeated Daniil Medvedev in the men's singles title at the 2019 US Open. It was Nadal's 19th Grand Slam singles title, and fourth US Open title.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

25 2159
Q:

What is a software project test plan?

Answer

A test plan is the master document that contains all details pertaining to testing of the application. Its contents include:


 


Testing scope - what is included and what is not included in the testing of the current project 


Assumptions - what are the assumptions that are made for this project 


Milestones - major dates like when testing is going to begin, when it is planned to end, what is the trace review date, what is the production date etc. 


Resources - the resources working on this project along with their contact details 


Defect tracking mechanism - what defect tracking tool will be used, what is the SLA for fixing Critical to Low level IRs etc. 


Test management procedures - who will be notified when there is a critical IR, what reports will be sent daily, if status calls will be held daily or weekly, where will it be held, who is required to join etc. 


Work allocation - resource distribution if more projects are being tested 


Entry and exit criterion - when can a project be accepted for testing (eg. only when smoke testing passes) and when can a project be termed as testing complete (eg. when all testcases are executed and all high level bugs are fixed)

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

3 2159