Questions

Q:

What is Trial Balance?

Answer

It is statement of balances of all the accounts in the ledger prepared to prove the arithmetical accuracy of the books of accounts.


A trial Balance is a list of Debit and Credit or a list of Debit & Credit Balance of all the ledger accounts prepared on any particular date

Report Error

View answer Workspace Report Error Discuss

Subject: Finance

1 2153
Q:

In what country would you find Coptic Christians?

Answer

Egypt

Report Error

View answer Workspace Report Error Discuss

Subject: World Geography

0 2153
Q:

Is the data bus in Bi-directional?

Answer

The data bus is Bi-directional because the same bus is used for transfer of data between Micro Processor and momory of input / output devices in both the direction.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

1 2153
Q:

Small most nearly means

A) Muscular B) Slippery
C) Tiny D) Bacon
 
Answer & Explanation Answer: C) Tiny

Explanation:

Small means a little in size or quantity.

Here in the given options, Tiny means same as small.

 

Hence, Small most nearly means as Tiny.

Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE , TOEFL
Job Role: Analyst , Bank Clerk , Bank PO

5 2153
Q:

Cholesterol belongs to which class of molecules?

A) Lipids B) Carbohydrates
C) Nucleic acids D) Proteins
 
Answer & Explanation Answer: A) Lipids

Explanation:

Cholesterol belongs to lipids class of molecules. Lipids are sometimes called as fats which act as storing energy and structural components of cell membranes.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

5 2152
Q:

What is a software project test plan?

Answer

A test plan is the master document that contains all details pertaining to testing of the application. Its contents include:


 


Testing scope - what is included and what is not included in the testing of the current project 


Assumptions - what are the assumptions that are made for this project 


Milestones - major dates like when testing is going to begin, when it is planned to end, what is the trace review date, what is the production date etc. 


Resources - the resources working on this project along with their contact details 


Defect tracking mechanism - what defect tracking tool will be used, what is the SLA for fixing Critical to Low level IRs etc. 


Test management procedures - who will be notified when there is a critical IR, what reports will be sent daily, if status calls will be held daily or weekly, where will it be held, who is required to join etc. 


Work allocation - resource distribution if more projects are being tested 


Entry and exit criterion - when can a project be accepted for testing (eg. only when smoke testing passes) and when can a project be termed as testing complete (eg. when all testcases are executed and all high level bugs are fixed)

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

3 2152
Q:

Estate Duty was introducded in ________

Answer

Estate Duty which was introduced in 1953, was withdrawn from March 1, 1985.

Report Error

View answer Workspace Report Error Discuss

2 2151
Q:

Many time we read in financial newspaper about the performance of the Core Sector in Economy. Which of the following is NOT included in the core sector of the same

A) Coal B) Cement
C) Steel D) Auto Sector
 
Answer & Explanation Answer: D) Auto Sector

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy

0 2150