Questions

Q:

Autoimmune diseases associated with vitiligo

A) Thyroiditis B) Diabetes mellitus
C) Psoriasis D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

Vitiligo is a condition in which the skin loses its pigment cells (melanocytes). This can result in discolored patches in different areas of the body, including the skin, hair, retina and mucous membranes.

vitiligo1531457140.jpg image

Many disorders have been linked to vitiligo. They are::

Hashimoto thyroiditis,

Graves disease,

Addison disease and

diabetes mellitus,

alopecia areata,

pernicious anemia,

inflammatory bowel disease,

psoriasis, and

autoimmune polyglandular syndrome.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank PO

4 2118
Q:

Groundwater is found underground in the zone of

A) Penetration B) Aeration
C) Saturation D) Both B & C
 
Answer & Explanation Answer: D) Both B & C

Explanation:

Groundwater is all the water that has penetrated the earth's surface and is found in one of two soil layers. The one nearest the surface is the "zone of aeration", where gaps between soil are filled with both air and water. Below this layer is the "zone of saturation", where the gaps are filled with water.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2118
Q:

Male is the Capital of ___________.

A) Algeria B) Maldives
C) Kenya D) Mauritius
 
Answer & Explanation Answer: B) Maldives

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Country Capitals
Exam Prep: Bank Exams

5 2118
Q:

A  photon  of  X-ray  has  energy  of  1  keV.  A photon of visible radiation has energy of 3 eV.  In  this  context,  which  one  of  the following statements is not correct?

A) The wavelength of X-ray photon is less than the wavelength of visible radiation photon. B) Both    the    photons    have    different energies.
C) The  speeds  of  both  the  photons  in vacuum are different D) The   frequency   of   X-ray   photon   is higher  than  the  frequency  of  visible radiation photon.
 
Answer & Explanation Answer: C) The  speeds  of  both  the  photons  in vacuum are different

Explanation:

The speed of all the electromagnetic radiation are always   same   and   equal   to   the numerical value 3 x 10^8m/sec.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

0 2118
Q:

Rate at which velocity changes over time?

A) Speed B) Displacement
C) Acceleration D) Jerk
 
Answer & Explanation Answer: C) Acceleration

Explanation:

Acceleration is nothing but the rate at which velocity changes over time.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

7 2117
Q:

The question below consists of a set of labelled sentences. Out of the four options given, select the most logical order of the sentences to form a coherent paragraph.
P- A sensitive mind easily absorbs the vibrations emanating from the thought of the people it associates with.
Q- We often say that a person is known by the company he keeps.
R- The violent can be made calm by exuding thought of love and compassion.
S- Visits to holy places are considered good because the good thoughts of the holy people gathered there and the ensuing vibrations definitely
affect one in a positive fashion.

A) RQPS B) QRSP
C) PQRS D) SRQP
 
Answer & Explanation Answer: A) RQPS

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2117
Q:

Project Integration Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Develop Project Charter phase?

Answer

I. Inputs



  • Contract (when applicable)

  • Project statement of work

  • Enterprise environmental factors

  • Organizational process assets


II. Tools and Techniques



  • Project selection methods

  • Project management methodology

  • Project management information system

  • Expert Judgment


III. Outputs


         1. Project charter

Report Error

View answer Workspace Report Error Discuss

0 2117
Q:

Project Communications Management

What are the Project Management Processes included in the Project Communications Management?

Answer

Communications planning - Determining the information and communications needs of the project stakeholders.


Information Distribution - Making needed information available  to project stakeholders in a timely manner.


Performance Reporting - Collecting and distributing performance information. This includes status reporting, progress measurement, and forecasting.


Manage Stakeholders - Managing communications to satisfy the requirements of and resolve issues with project stakeholders.

Report Error

View answer Workspace Report Error Discuss