Questions

Q:

When hot water is placed into an empty water bottle, the bottle keeps its shape and does not soften. What type of plastic is the water bottle made from?

A) Thermoplastic B) PVC
C) Polyurethane D) Thermosetting
 
Answer & Explanation Answer: D) Thermosetting

Explanation:

Thermoset, or thermosetting, plastics are synthetic materials that strengthen during being heated, but cannot be successfully remouldedor reheated after their initial heat-forming. This contrasts withthermoplastics, which soften when heated and harden and strengthen after cooling. Thermoplastics can be heated, shaped and cooled as often as necessary without causing a chemical change, while thermosetting plastics will burn when heated after the initial moulding.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: Bank Exams

3 2050
Q:

The purpose of the constitution is presented in the

A) Amendments B) Preamble
C) Bill of Rights D) Articles
 
Answer & Explanation Answer: B) Preamble

Explanation:

The Preamble proclaims the solemn resolution of the people of India to constitute India into a 'Sovereign socialist secular democratic republic'.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2049
Q:

The force that generates wind is

A) Gravity force B) Pressure gradient force
C) Coriolis force D) Centrifugal force
 
Answer & Explanation Answer: B) Pressure gradient force

Explanation:

Wind is the flow of gases on a large scale. On the surface of the Earth, wind consists of the bulk movement of air. The force that generates wind is called as Pressure gradient force.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2049
Q:

The plants which flower only once in their lifetime are called

A) Monocots B) Monocarpic
C) Monogenic D) Monogamous
 
Answer & Explanation Answer: B) Monocarpic

Explanation:

The plants which flower only once in their lifetime are called Monocarpic Plants.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2049
Q:

Hub works on which layer?

A) Network layer B) Physical layer
C) Data link layer D) All of the above
 
Answer & Explanation Answer: B) Physical layer

Explanation:

Hub works on layer 1 i.e, physical layer.

Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2049
Q:

A factory employs skilled workers, unskilled workers and clerks in the proportion 8 : 5 : 1, and the wages of a skilled worker, an unskilled worker and a clerk are in the ratio 5 : 2 : 3. When 20 unskilled workers are employed, the total daily wages of all amount to Rs 318. Total wages paid to each category of workers are

A) Rs 240, Rs 60, Rs 18 B) Rs 200, Rs 90,Rs 28
C) Rs 150, Rs 108, Rs 60 D) Rs 250, Rs 50, Rs 18
 
Answer & Explanation Answer: A) Rs 240, Rs 60, Rs 18

Explanation:
Report Error

View Answer Report Error Discuss

0 2049
Q:

The more there is the less you see. What is that?

Answer

It is Darkness.


If it is more darkness outside, we can see less in that.

Report Error

View answer Workspace Report Error Discuss

Subject: Word Puzzles Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank Clerk , Bank PO

1 2049
Q:

How do you differentiate the roles of Quality Assurance Manager and Project Manager?

Answer

Quality Assurance Manager (QA Manager) defines the process to be followed at each phase of SDLC. He defines the standards to be followed, the documents to be maintained and sets the standard for the product.


Where as it is the Project Manager’s responsibility to ensure that the things defined by QA manager are being implemented. He develops the product from start to finish with his team and ensures that the product which is to be rolled out is Defect free and it reaches the standards and views defined by QA Manager.


QA managers can audit the process for certain time periods which are being handled by the Project Manager.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

0 2048