Questions

Q:

What are system calls?

Answer

System calls provide the interface between a process and the operating system. System calls for modern Microsoft windows platforms are part of the win32 API, which is available for all the compilers written for Microsoft windows.

Report Error

View answer Workspace Report Error Discuss

1 1993
Q:

What are deadlock prevention techniques?

Answer

Mutual exclusion


Hold and wait


No preemption


Circular wait

Report Error

View answer Workspace Report Error Discuss

0 1993
Q:

The Great Gatsby is written in which point of view?

A) first person limited B) first person omniscient
C) third person limited D) None of the above
 
Answer & Explanation Answer: A) first person limited

Explanation:

A first person point of view is said by a character who is invoved in the events of the story and unlike third person point of views will actually use words such as 'we' or 'I'.

  

The Great Gatsby is told from the point of view of Nick Carroway. He is from the Midwest, but narrates the story after it takes place in the East. As such, he is an outsider, and tends to judge what he experiences in the East based on his midwestern ideas and values.

 

Nick makes an effort to assure the reader that he is nonjudgmental and completely honest. This is ironic, because he is very judgmental and opinionated.

Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors
Exam Prep: Bank Exams , AIEEE
Job Role: Bank PO , Analyst

3 1992
Q:

What "line" divides the northern and southern US states?

Answer

Mason–Dixon line

Report Error

View answer Workspace Report Error Discuss

Subject: World Geography

0 1992
Q:

What are the blocking and non-blocking assignments in Verilog and which is preferred in Sequential Circutis?

Answer

A blocking assignment is one in which the statements are executed sequentially, i.e., first statement is executed and variable is assigned  a value then second is executed and so on. A non blocking assignment is  one in which statements occurs conturrently, only non blocking assignments should be used in sequential circuit.


 


e.g.


initial


begin


a=b; //blocking


c<=a; //nonblocking


d=c; // blocking


end


 


In this example firstly the value of b is assigned to a and this value is assigned to c only after execution of first statement. the second and the third statements are executed simultaneously, i.e. value a ais assigned to c and previous value if c is assigned to d.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 1992
Q:

In what way is geography an integrative science?

A) Geography is an integrative science because it borrows from physical sciences such as chemistry, biology, meterology, and geology B) Geography is an integrative science because it borrows from human science such as cultural studies , economics , and public policy
C) Geography is an integrative science because it examines Earth in both physical and human terms D) All of the above
 
Answer & Explanation Answer: C) Geography is an integrative science because it examines Earth in both physical and human terms

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 1992
Q:

Marasmus usually is associated with a deficiency of

A) Vitamins B) Calories
C) Proteins D) Fats
 
Answer & Explanation Answer: B) Calories

Explanation:

Marasmus usually is associated with a deficiency of Calories.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 1992
Q:

Project Risk Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Risk Monitoring and Control?

Answer

I. Inputs



  • Risk management plan

  • Risk register

  • Approved change requests

  • work performance information

  • performance reports


II. Tools and Techniques



  • Risk reassessment

  • Risk audits

  • Variance and trend analysis

  • Technical performance measurement

  • Reserve analysis

  • Status meetings


III. Outputs



  • Risk register (updates)

  • Requested changes

  • Recommended corrective actions

  • Recommended preventive actions

  • Organizational process assets (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 1991