Questions

Q:

During Mughal period there was continuous emigration of the .........to places ruled by Hindu Rajas

A) Nobles B) Poor
C) Middle Class D) Foreign residents
 
Answer & Explanation Answer: B) Poor

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History

0 3472
Q:

In the context of memory management, what are placement and replacement algorithms?

Answer

Placement algorithms determine where in available real-memory to load a program. Common methods are first-fit, next-fit, best-fit. Replacement algorithms are used when memory is full, and one process (or part of a process) needs to be swapped out to accommodate a new program. The replacement algorithm determines which are the partitions to be swapped out.

Report Error

View answer Workspace Report Error Discuss

3 3470
Q:

State funding of elections takes place in

A) France and Italy B) USA and Canada
C) Germany and Austria D) Britain and Switzerland
 
Answer & Explanation Answer: C) Germany and Austria

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

1 3470
Q:

When Ionic bonds are formed metallic atoms tend to

A) share electrons B) gain electrons
C) lose electrons D) None of above
 
Answer & Explanation Answer: C) lose electrons

Explanation:

Ionic bonding is the complete transfer of valence electron(s) between atoms. It is a type of chemical bond that generates two oppositely charged ions. In ionic bonds, the metal loses electrons to become a positively charged cation, whereas the nonmetal accepts those electrons to become a negatively charged anion.

 

Hence, when Ionic bonds are formed metallic atoms tend to lose electrons and become positive ions

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

2 3469
Q:

Which one of the following is not true for minerals?

A) they can be a liquid, solid, or glass B) they can be identified by characteristic physical properties
C) they have a specific, internal, crystalline structure D) they have a specific, predictable chemical composition
 
Answer & Explanation Answer: A) they can be a liquid, solid, or glass

Explanation:

A mineral is a naturally occurring, inorganic solid, with a definite chemical composition. They cannot be in liquid or gas state. They exists only in solid state.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 3469
Q:

To eliminate definition duplication, XML Schemas define:

A) an intersection table. B) global elements.
C) a normalized definition table. D) None of the above is correct.
 
Answer & Explanation Answer: B) global elements.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Database

2 3468
Q:

 The ODBC Level 1 API contains which of the following functions?

A) Browse possible connections and data sources only B) Connect to data sources with driver-specific information only
C) Process a scrollable cursor only D) Both 1 and 3 above are in the OBDC Level 1 API.
 
Answer & Explanation Answer: B) Connect to data sources with driver-specific information only

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Database

1 3468
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3468