Other things equal an improvement in productivity will

A) shift the aggregate demand curve to the left B) shift the aggregate supply curve to the right
C) increase the equilibrium price level D) shift the aggregate supply curve to the left
 
Answer & Explanation Answer: B) shift the aggregate supply curve to the right

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Business Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2130
Q:

Human gametes are produced by

A) Mitosis B) Meiosis
C) Replication D) None of the above
 
Answer & Explanation Answer: B) Meiosis

Explanation:

In humans all reproduction is sexual. It involves joining together haploid gamete cells from each parent with half the normal number of chromosomes to make a new cell containing both parents' genetic material. This is a diploid zygote. The cells from each parent that combine to form the zygote are called gametes.

 

Meiosis produces haploid gametes from a diploid parental cell.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2129
Q:

Exercise intensity refers to

A) the specific component of fitness an activity is designed to improve B) the length of time or number of repetitions to be completed in one workout session
C) the number of times per week you need to do a particular exercise to see benefits. D) how much energy is expended while exercising
 
Answer & Explanation Answer: D) how much energy is expended while exercising

Explanation:

Exercise intensity refers to how much energy is expended while exercising.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2129
Q:

Mortar is a mixture of

A) cement B) water
C) sand D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

Mortar is a mixture of cement or lime as a binder, sand and water.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2128
Q:

An electron and a proton starting from rest get accelerated through potential difference of 100kV. The final speeds of the electron and the proton are Ve and Vp respectively. Which of the following relations is correct?

A) Ve > Vp B) Ve < Vp
C) Ve = Vp D) Cannot be determined
 
Answer & Explanation Answer: A) Ve > Vp

Explanation:

Both when accelerated through a potential difference of 100KV, they will have the same energy. The mass of the electron is less than the mass of a proton, hence it will move faster(momentum).

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

3 2128
Q:

Hydro-electric power provides more than 90% of the total power consumed in 

A) Norway B) Sweden
C) India D) UK
 
Answer & Explanation Answer: A) Norway

Explanation:

The short and swift streams running down the Scandinavian mountains have been harnessed for power which also compensates for the absence of coal and oil.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography

1 2128
Q:

Select the antonym of
frazzle

A) prostration B) vigour
C) enervation D) lassitude
 
Answer & Explanation Answer: B) vigour

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2128
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Development?

Answer

I. Inputs



  • Organizational process assets

  • Project scope statement

  • Activity list

  • Activity attributes

  • Project schedule network diagrams

  • Activity resource requirements

  • Resource calendars

  • Activity duration estimates 

  • Project management plan


                - RisK register


II. Tools and Techniques



  • Schedule network analysis

  • Critical path method

  • Schedule compression

  • What-if scenario analysis

  • Resource leveling

  • Critical chain method

  • Project management software

  • Applying calendars

  • Adjusting leads and lags 

  • Schedule model


III. Outputs



  • Project schedule

  • Schedule model data

  • Schedule baseline

  • Resource requirements (updates)

  • Activity attributes (updates)

  • Project calendar (updates)

  • Requested changes

  • Project management plan (updates)


                 - Schedule management plan(updates)

Report Error

View answer Workspace Report Error Discuss

0 2127