Questions

Q:

Nematodes and arthropods both

A) are suspension feeders B) have ciliated larvae
C) develop an anus from the blastopore (pore) formed in the gastrula stage D) grow by shedding their exoskeleton
 
Answer & Explanation Answer: D) grow by shedding their exoskeleton

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2088
Q:

Explain compiler?

Answer

compiler is used to translate the high-level language program into machine code at a time. It doesn't require special instruction to store in a memory, it stores automatically. the execution time is less compared interpreter.


A compiler is a program that translates a source program written in some high-level programming langualge (such as Java) into machine code for some computer architecture (such as the Inter Pentium archiecture).

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2088
Q:

What has no beginning end or middle?

Answer

Anything which is circular shape has no beginning, no middle or no end. 


The food like donuts have no beginning, end or middle. 

Report Error

View answer Workspace Report Error Discuss

Subject: Word Puzzles Exam Prep: TOEFL , GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

2 2087
Q:

If an animal is an ectotherm, it has?

A) A skeleton on the inside of its body B) A body that does not produce much internal heat
C) A skeleton on the outside of its body D) A body that regulates its own internal temperature
 
Answer & Explanation Answer: B) A body that does not produce much internal heat

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Animals and Birds
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2087
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Budgeting ?

Answer

I. Inputs



  • Project scope statement

  • Work breakdown structure

  • WBS dictionary

  • Activity cost estimates

  • Activity cost estimate supporting detail

  • Project schedule 

  • Resource calendars 

  • Contract

  • Cost management plan


II. Tools and Techniques



  • Cost aggregation

  • Reserve analysis

  • Parametric estimating 

  • Funding limit reconciliation


III. Outputs



  • Cost baseline 

  • Project funding requirements 

  • Cost management plan (updates)

  • Requested changes

Report Error

View answer Workspace Report Error Discuss

0 2087
Q:

A universal recipient blood group belongs to

A) O B) A
C) B D) AB
 
Answer & Explanation Answer: D) AB

Explanation:

In transfusions of packed red blood cells, individuals with type O Rh D negative blood are often called universal donors. Those with type AB Rh D positive blood are called universal recipients.

The immune system of a person with AB blood will accept blood from all possible donors, whether they have O, A, B, or AB blood. Since both A and B antigens are present in a person with AB blood, the recipient won't reject the blood. The body identifies that blood as "self" rather than "foreign."

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

12 2087
Q:

Which is an example of a physical change?

A) Dissolving sugar in water B) Breaking glass
C) Melting of ice D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

In all the above given options, there is no chemical change or reactions takes place only the shape or physical state is changed.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2086
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Activity Resource Estimating ?

Answer

I. Inputs



  • Enterprise environmental factors

  • Organizational process assets

  • Activity list

  • Activity attributes

  • Resource availability

  • Project management plan


II. Tools and Techniques



  • Expert Judgment

  • Alternatives analysis

  • Published estimating data

  • Project management software

  • Bottom-up estimating


III. Outputs



  • Activity resource requirements

  • Activity atributes (updates)

  • Resource breakdown structure

  • Resource calendars (updates)

  • Requested changes

Report Error

View answer Workspace Report Error Discuss

0 2086