Questions

Q:

Southerners who were for redemption wanted which of the following?

A) remove blacks from politics B) remove republicans from politics
C) hold political power D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World History
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

0 2076
Q:

In loading programs into memory, what is the difference between load-time dynamic linking and run-time dynamic linking?

Answer

For load-time dynamic linking: Load module to be loaded is read into memory. Any reference to a target external module causes that module to be loaded and the references are updated to a relative address from the start base address of the application module.


With run-time dynamic loading: Some of the linking is postponed until actual reference during execution. Then the correct module is loaded and linked.

Report Error

View answer Workspace Report Error Discuss

0 2076
Q:

Swap two variables without using third variable.

Answer

#include<stdio.h>
int main(){
    int a=5,b=10;
    a=b+a;
    b=a-b;
    a=a-b;
    printf("a= %d  b=  %d",a,b);
}

Report Error

View answer Workspace Report Error Discuss

Subject: Programming

0 2075
Q:

What is process synchronization?

Answer

A situation, where several processes access and manipulate the same data concurrently and the outcome of the execution depends on the particular order in which the access takes place, is called race condition. To guard against the race condition we need to ensure that only one process at a time can be manipulating the same data. The technique we use for this is called process synchronization.

Report Error

View answer Workspace Report Error Discuss

1 2075
Q:

A watch is listed for Rs.230 and is sold at a discount of 12%, then the sale price of the watch is

A) Rs.27.6 B) Rs.276
C) Rs.202.4 D) Rs.257.6
 
Answer & Explanation Answer: C) Rs.202.4

Explanation:
Report Error

View Answer Report Error Discuss

1 2075
Q:

Project Time Management

What are the Project Management Processes included in the Project Time Management?

Answer

Activity Definition - Identifying the Specific schedule activities that need to be performed to produce the various project deliverables.


Activity Sequencing - Identifying and documenting dependencies among schedule activities


Activity Resource Estimating - Estimating the type and quantities of resources required to perform each schedule activity


Activity Duration Estimating - Estimating the number of work periods that will be needed to complete individual schedule activities


Schedule Development - Analyzing activity sequences, durations, resource requirements, and schedule constraints to creae the project schedule.


Schedule Control - Controlling changes to the project schedule

Report Error

View answer Workspace Report Error Discuss

0 2075
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Estimating ?

Answer

I. Inputs



  • Enterprise environmental factors

  • Organizational process assets 

  • Project scope statement

  • Work breakdown structure

  • WBS dictionary 

  • Project management plan


             - Schedule management plan


             - Staffing management plan


             - Risk register


II. Tools and Techniques



  • Analogous estimating

  • Determine resource cost rates

  • Bottom-up estimating

  • Parametric estimating

  • Project management software

  • Vendor bid analysis

  • Reserve analysis

  • Cost of quality


III. Outputs



  • Activity cost estimates 

  • Activity cost estimate supporting detail 

  • Requested changes

  • Cost management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2075
Q:

In each of the questions, four alternatives are given for the Idiom/Phrase. Choose the alternative which best expresses the meaning of the Idiom/Phrase and click the button corresponding to it.

Cat­nap

A)  Rest B) Fitful sleep
C)  Long sleep D)  Short sleep
 
Answer & Explanation Answer: D)  Short sleep

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: TOEFL , GRE , CAT

0 2075