Questions

Q:

Which of the following is a feature of ghrelin?

A) It stimulates appetite and energy storage B) It is released in high amounts from adipocytes during periods of excess energy intake
C) The blood level in the fasting state correlates directly with body weight D) It is a metabolic antagonist of leptin
 
Answer & Explanation Answer: A) It stimulates appetite and energy storage

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

1 2085
Q:

Production costs to an economist

A) reflect opportunity costs B) consist only of explicit costs
C) always reflect monetary outlays D) never reflect monetary outlays
 
Answer & Explanation Answer: A) reflect opportunity costs

Explanation:

Production costs to an economist reflect opportunity costs.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2085
Q:

Animals in the Taiga and Alpine Biomes hibernate during winter.

A) TRUE B) FALSE
Answer & Explanation Answer: A) TRUE

Explanation:

True, Animals in the Taiga and Alpine Biomes hibernate during winter.


 


The animals in taiga and alpine biomes have several different kind of adaptations for survival. Some animals that hibernate during the winter take the help of camouflage to protect itself from enemies. During this period of hibernation, they slow their rate of metabolism and also use less amount of energy to survive the harsh weather.

Report Error

View Answer Workspace Report Error Discuss

Subject: Animals and Birds
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

5 2085
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Development?

Answer

I. Inputs



  • Organizational process assets

  • Project scope statement

  • Activity list

  • Activity attributes

  • Project schedule network diagrams

  • Activity resource requirements

  • Resource calendars

  • Activity duration estimates 

  • Project management plan


                - RisK register


II. Tools and Techniques



  • Schedule network analysis

  • Critical path method

  • Schedule compression

  • What-if scenario analysis

  • Resource leveling

  • Critical chain method

  • Project management software

  • Applying calendars

  • Adjusting leads and lags 

  • Schedule model


III. Outputs



  • Project schedule

  • Schedule model data

  • Schedule baseline

  • Resource requirements (updates)

  • Activity attributes (updates)

  • Project calendar (updates)

  • Requested changes

  • Project management plan (updates)


                 - Schedule management plan(updates)

Report Error

View answer Workspace Report Error Discuss

0 2084
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Control ?

Answer

I. Inputs



  • Schedule management plan

  • Schedule baseline

  • Performance reports

  • Approved change requests


II. Tools and Techniques



  • Progress reporting

  • Schedule change control system

  • Performance measurement

  • Project management software

  • Variance analysis

  • Schedule comparision bar charts


III. Outputs



  • Schedule model data (updates)

  • Schedule baseline (updates)

  • Performance measurements

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Activity list (updates)

  • Activity attributes (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2084
Q:

Project Quality Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Perform Quality Control?

Answer

I. Inputs



  • Quality management plan

  • Quality metrics 

  • Quality checklists

  • Organizational process assets

  • Work performance information

  • Approved change requests

  • Deliverables


II. Tools and Techniques



  • Cause and effect diagram

  • Control charts

  • Flow Charting

  • Histogram

  • Pareto chart

  • Run chart

  • Scatter diagram

  • Statistical sampling

  • Inspection

  • Defect repair review


III. Outputs



  • Quality control measurements

  • Validated defect repair

  • Quality baseline (updates)

  • Recommended corrective actions

  • Recommended preventive actions

  • Requested changes

  • Recommended defect repair

  • Organization process assets (updates)

  • Validated deliverables

  • Project management plan (updates)


 


 

Report Error

View answer Workspace Report Error Discuss

0 2084
Q:

What is located at 180 degrees longitude?

A) Fiji B) Russia
C) Antarctica D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

The 180th meridian or antimeridian is the meridian 180° east or west of the Prime Meridian, with which it forms a great circle dividing the earth into the Western and Eastern Hemispheres.

It is common to both east longitude and west longitude.

It is used as the basis for the International Date Line because it mostly passes through the open waters of the Pacific Ocean. However, the meridian passes through Russia and Fiji as well as Antarctica.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2084
Q:

The two purines in DNA are

A) Adenine & Thymine B) Thymine & Uracil
C) Guanine & Uracil D) Adenine & Guanine
 
Answer & Explanation Answer: D) Adenine & Guanine

Explanation:

The purines are bases in the DNA. The two purines in DNA are Adenine and Guanine. These two purines forms hydrogen bonds with their complimentary pyrimidines such as Thymine and Cytosine to keep the two rails of the DNA molecule together.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 2084