Questions

Q:

Coagulation during water treatment is designed to remove

A) Sand and gravel B) Bad smells
C) Pathogenic microorganisms D) Particles suspended in water
 
Answer & Explanation Answer: D) Particles suspended in water

Explanation:

Coagulation is a chemical process that involves neutralization of charge. Coagulation during water treatment is designed to remove particles suspended in water.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

11 2367
Q:

Explain the difference between fixed and flexible budgets ?

Answer

1. A fixed budget is established for a specific level of activity whereas flexible budget is prepared for various levels of activity.


2. Fixed budget cannot be changed after the period commences, whereas a flexible budget can be changed after the period commence.


3. Fixed budget is more suitable for fixed expenses whereas flexible budget takes both fixed as well as variable expenses in account.


4. Fixed budget includes only fixed costs, whereas a flexible budget includes fixed costs, variable costs and semi variable costs.


5. Fixed budget is mainly used in planning stage whereas flexible budget is used in controlling stage.

Report Error

View answer Workspace Report Error Discuss

Subject: Finance Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

1 2367
Q:

Is the address bus unidirectional?

Answer

The address bus is unidirectional because the address information is always given by the micro processoe  to address a memory location of an input / output devices.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2367
Q:

I make things short but I am pretty long myself. What am I?

Answer

I am ABBREVIATION that make things short but I am pretty long myself.


 


Example ::


HIV - Human Immuno Virus


WHO - World Health Organization

Report Error

View answer Workspace Report Error Discuss

2 2367
Q:

The purpose of hydrogenating unsaturated fats is to

The_purpose_of_hydrogenating_unsaturated_fats_is_to1552999400.jpg image

A) to make them more solid at room temperature B) to recommend daily intake as fiber
C) to make them more liquid D) None of the above
 
Answer & Explanation Answer: A) to make them more solid at room temperature

Explanation:

The purpose of hydrogenating unsaturated fats is to make them more solid at room temperature as it is easy store the product.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 2366
Q:

Which of the following is a false statement?

A) As bond order increases the strength of the bond increases B) Bond order is proportional to the bond length
C) Molecules with negative bond order are highly unstable D) Bond order is inversely proportional to the bond length
 
Answer & Explanation Answer: B) Bond order is proportional to the bond length

Explanation:

Bond order is proportional to the bond length is a False statement since Bond order is inversely proportional to the bond length.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 2366
Q:

A protein is being assembled when

A) RNA is being translated B) DNA is being translated
C) RNA is being transcribed D) DNA is being transcribed
 
Answer & Explanation Answer: A) RNA is being translated

Explanation:

A protein is being assembled when RNA is being translated. This process goes as, by the process of transcription first DNA is is converted to mRNA. And then by the process of translation this mRNA is converted to proteins.

=> DNA ----> mRNA ----> Proteins.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

4 2365
Q:

4 phases of project management are

Answer

The project management life cycle describes high-level processes for delivering a successful project.


The project management life cycle is usually broken down into four phases:


1. Initiation and Planning,


2. Execution,


3. Project Monitoring and Control, and


4. Project Closing.

Report Error

View answer Workspace Report Error Discuss

11 2365