Questions

Q:

Project Quality Management

What are the Project Management Processes included in the Project Quality Management?

Answer

Quality planning - Identifying which quality standards are relevant to the project and determining how to satisfy them


Perform Quality Assurance - Applying the planned , systematic quality activities to ensure that the project employs all processes needed to meet requirements.


Perform Quality Control - monitoring specific project results to determine whether they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance.

Report Error

View answer Workspace Report Error Discuss

0 2437
Q:

Who wrote the book ' The Disrupter - Arvind Kejriwal and the Audacious Rise of the Aam Aadmi '

Answer

Gautam Chikermane with Soma Banerjee

Report Error

View answer Workspace Report Error Discuss

0 2437
Q:

Cast iron during machining produces

A) Discontinuous chips B) Continuous chips with build up edge
C) Continuous chips D) All of the above
 
Answer & Explanation Answer: A) Discontinuous chips

Explanation:

Cast iron is a group of iron-carbon alloys with a carbon content greater than 2% and is a brittle material.

cast_iron_during_machining_produces1545889160.jpg image


Its usefulness derives from its relatively low melting temperature.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2437
Q:

Which Indian social theorist had argued that the idea of a homogenized the 'cultural arrogance of post-enlightenment Europe'?

 

A) Ashis Nandy B) Partha Chatterjee
C) T.K.Oommen D) Rajni Kothari
 
Answer & Explanation Answer: A) Ashis Nandy

Explanation:

Ashis Nandy traced the roots of colonialism's mandate to absolutize the relative differences between cultures to the cultural arrogance of Enlightenment Europe.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams

1 2437
Q:

Acceptable noise level for human ear

A) > 85 db B) = 85 db
C) < 85 db D) None of the above
 
Answer & Explanation Answer: C) < 85 db

Explanation:

Sound intensity or level is measured by a unit called a decibel. An 85 decibel noise level is not a safe standard for the public.

 

Hence, Acceptable noise level for human ear is less than 85 db.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2437
Q:

The rate at which energy is transferred is called

A) Power B) Watt
C) Volt D) Potential
 
Answer & Explanation Answer: A) Power

Explanation:

Energy can be transferred from one system to the other. The rate at which energy is transferred from one system to other system is called POWER. Energy transferred in one second is called a watt.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2437
Q:

Plants developing in dry conditions are

A) lithophytes B) hydrophytes
C) mesophytes D) xerophytes
 
Answer & Explanation Answer: D) xerophytes

Explanation:

Plants developing in dry conditions are called as xerophytes.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

7 2437
Q:

Which subatomic particle has no charge?

A) electron B) neutron
C) proton D) All of the above
 
Answer & Explanation Answer: B) neutron

Explanation:

An atom is composed of three subatomic particles. They are ::

 

1) Electron (-vely charged particle)

2) Proton (+vely charged particle)

3) Neutron (No charge particle)

 

Hence, Neutron is the subatomic particle which has no charge.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2436