Questions

Q:

Which organelles supply energy to the cell?

A) Mitochondria B) Cytoplasm
C) Ribosomes D) None of the above
 
Answer & Explanation Answer: A) Mitochondria

Explanation:

Mitochondria which is present in both plant and animal cells supplies energy to the cells and hence called as the powerhouse of the cell.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 2160
Q:

Read the following passage carefully and choose the most appropriate answer to the question out of the four alternatives.

 


To avoid the various foolish opinions to which mankind are prone, no superhuman brain is required. A few simple rules will keep you free, not from all errors, but from silly errors. If the matter is one that can be settled by observation, make the observation yourself. Aristotle could have avoided the mistake of thinking that women have fewer teeth than men, by the simple device of asking Mrs. Aristotle to keep her mouth open while he counted. Thinking that you know when in fact you do not is a bad mistake, to which we are all prone. I believe myself that hedgehogs eat black beetles, because I have been told that they do; but if I were writing a book on the habits of hedgehogs, I should not commit myself until I had seen one enjoying this diet. Aristotle, however, was less cautious. Ancient and medieval writers knew all about unicorns and salamanders; not one of them thought it necessary to avoid dogmatic statements about them because he had never seen one of them.

 

The author is in favour of drawing conclusions on the basis of

 

A) discussion B) consultation
C) observation D) reasoning
 
Answer & Explanation Answer: C) observation

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams , GRE , TOEFL

0 2160
Q:

If you look into a mirror and find that the image (your reflection) is smaller than you, then the type of the mirror is:

A) concave mirror B) convex mirror
C) plano-concave mirror D) plane mirror
 
Answer & Explanation Answer: B) convex mirror

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

2 2160
Q:

What is the resistance (in ohm) of an electrical component if a current of 0.1 A passes through it on application of 5 V of potential difference across it?

A) 0.5 B) 100
C) 50 D) 1
 
Answer & Explanation Answer: C) 50

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

0 2160
Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.


How was the fund for pipeline - construction generated?

A) 8 major oil companies joined hands to share the cost B) 8 major oil companies borrowed $8 billion.
C) A single private company raised $8 billion D) Oil rights were sold to 8 major oil companies
 
Answer & Explanation Answer: A) 8 major oil companies joined hands to share the cost

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2160
Q:

The Second World War ended in

Answer

1945 AD

Report Error

View answer Workspace Report Error Discuss

Subject: World History

1 2159
Q:

Who is the Formula one driver, has won the Hungarian Grand Prix for the 6th time?

A) Lewis Hamilton B) Sebastian Vettel
C) Sergio Perez D) Daniel Ricciardo
 
Answer & Explanation Answer: A) Lewis Hamilton

Explanation:

Lewis Hamilton of Mercedes won the Hungarian Grand Prix for the 6th time, at the Hungaroring circuit, in Hungary.

 

This is the 67th career victory for Lewis Hamilton.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2159
Q:

Project Scope Management

What are the Project Management Processes included in the Project Scope Management?

Answer

Scope Planning - Creating a project scope management plan that documents how the project scope will be defined,verified, controlled, and how the work breakdown structure (WBS) will be created and defined.


Scope Definition - Developing a detailed project scope statement as the basis for future project decisions.


Create WBS - Subdividing the major project deliverables and project work into smaller, more manageable components


Scope Verification - Formalizing acceptance of the completed project deliverables.


Scope Control - Controlling changes to the project scope.

Report Error

View answer Workspace Report Error Discuss

0 2159