Questions

Q:

Which of the following events is not related to the era of Warren Hastings?

A) First Anglo-Maratha War B) Rohilla War
C) Chait Singh Incident   D) The establishment of the College of Hellbury
 
Answer & Explanation Answer: D) The establishment of the College of Hellbury

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: Bank Exams

0 2146
Q:

When was Zoroastrianism founded?

A) 4th century BCE B) 6th century BCE
C) 8th century BCE D) 10th century BCE
 
Answer & Explanation Answer: B) 6th century BCE

Explanation:

Zoroastrianism is one of the world's oldest extant religions. It is the ancient pre-Islamic religion of Iran that survives there in isolated areas and, more prosperously, in India, where the descendants of Zoroastrian Iranian (Persian) immigrants are known as Parsis, or Parsees.

 

The Iranian prophet and religious reformer Zarathustra flourished before the 6th century BCE more widely known outside Iran as Zoroaster is traditionally regarded as the founder of the religion.

 

Zoroastrianism contains both monotheistic and dualistic features. It likely influenced the other major Western religions—Judaism, Christianity, and Islam.

Report Error

View Answer Report Error Discuss

Filed Under: World History
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 2146
Q:

The main source of organic matter in soil is

A) bacteria B) fungi
C) water D) plants
 
Answer & Explanation Answer: D) plants

Explanation:

The main source of organic matter in soil is the plant and animal tissue that decompose at each level of breakdown.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

5 2146
Q:

A permanent magnet can affect

A) Magnets B) Electromagnets
C) Both A & B D) None of the above
 
Answer & Explanation Answer: C) Both A & B

Explanation:

A permanent magnet can affect both magnets and electromagnets.

a_permanent_magnet_can_affect1559196137.jpg image

A permanent magnet has natural magnetic properties while a temporal magnet is created by artificial means. Permanent magnets do not lose their magnetic ability.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2146
Q:

Under which Article the President can declare financial emergency?

A) Article 360 B) Article 356
C) Article 352 D) Article 350
 
Answer & Explanation Answer: A) Article 360

Explanation:

The President can declare financial emergency under Article 360.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2146
Q:

As water is cooled from 4 deg C to 0 deg C, its density

A) decreases B) increases
C) remains same D) zero
 
Answer & Explanation Answer: A) decreases

Explanation:

When water is cooled from 4°C to 0°C, its density decreases.

 

When water cools from 4°C to 0°C, ice crystals begin to form because the water is approaching its freezing point. When water freezes, the water molecules form a lattice that increases the volume. As a result, the density decreases. This is why ice will float on top of water; ice has a lower density than the water.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

4 2145
Q:

The 4th Agri Leadership Summit 2019 held at?

A) Haryana B) Uttar Pradesh
C) West Bengal D) Assam
 
Answer & Explanation Answer: A) Haryana

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2145
Q:

Project Scope Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Scope control ?

Answer

I. Inputs



  • Project scope statement

  • Work breakdown structure

  • WBS dictionary

  • Project scope management plan

  • Performance reports

  • Approved change requests

  • Work performance information


II. Tools and Techniques



  • Change control system

  • Variance analysis

  • Replanning

  • Configuration management system


III. Outputs



  • Project scope statement(updates)

  • Work breakdown structure(updates)

  • WBS dictionary (updates)

  • Scope baseline (updates)

  • Requested changes

  • Recommended  corrective action

  • Organizational process assets (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2145