Questions

Q:

The basic structural unit of the body is the

A) Organs B) Cell
C) Nerve D) Brain
 
Answer & Explanation Answer: B) Cell

Explanation:

Cells are the the basic structural unit of the body.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

5 2355
Q:

Process of gaining electrons is known as _____.

A) oxidation B) reduction
C) radiation D) both oxidation and reduction
 
Answer & Explanation Answer: B) reduction

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: Bank Exams

0 2355
Q:

Which is the first payment bank in India?

A) Fino Payments Bank B) Airtel Payments Bank
C) Aditya Birla Payments Bank D) Paytm Payments Bank
 
Answer & Explanation Answer: B) Airtel Payments Bank

Explanation:

Airtel Payments Bank is the first payment bank in India. A payments bank is a new category of banks conceptualized by the Reserve Bank of India, which operates at a smaller scale than an actual bank and doesn't involve any credit risk. It can carry out most banking operations but can't advance loans or issue credit cards.

 


The RBI as of date has given licences to 11 payments bank of which six are currently operational. These include

  1. Aditya Birla Payments Bank,
  2. Airtel Payments Bank,
  3. India Post Payments Bank,
  4. Fino Payments Bank,
  5. Jio Payments Bank (and)
  6. Paytm Payments Bank.
Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2355
Q:

Which gas is a source of natural groundwater pollution?

A) Helium B) Krypton
C) Radon D) Argon
 
Answer & Explanation Answer: C) Radon

Explanation:

Radon gas is a source of natural groundwater pollution.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2354
Q:

Which is not a benefit of burning garbage for fuel?

A) It creates more space for farming B) It produces methane that can be used like natural gas
C) It partially addresses the solid waste disposal problem D) It provides biomass energy
 
Answer & Explanation Answer: A) It creates more space for farming

Explanation:

Garbage burning is common in rural areas, but it poses health concerns and hazards to the environment. It especially affects people with sensitive respiratory systems, as well as children and the elderly.

 

Benefits ::

  • It produces methane that can be used like natural gas.
  • It partially addresses the solid waste disposal problem.
  • It provides biomass energy.

 

Hence, it creates more space for farming is not the benefit of the burning garbage.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

2 2354
Q:

Liquids and gases never show

A) diamagnetic property B) paramagnetic property
C) ferromagnetic property D) electromagnetic property
 
Answer & Explanation Answer: C) ferromagnetic property

Explanation:

On the basis of magnetic properties, substances are classified into three groups namely diamagnetic, paramagnetic and ferromagnetic.

As solids diffuse and reorder very slowly under ambient conditions, the net, directionally dependent (anisotropic) magnetic moment can persist. Conversely, liquids and gases freely tumble and reorder: water rearranges every few pico seconds (10^12 times per second).

Hence liquids and gases can never show ferromagnetic properties.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

0 2354
Q:

The 8th World CSR Congress 2019 in?

A) Mumbai B) Hyderabad
C) Kolkata D) Pune
 
Answer & Explanation Answer: A) Mumbai

Explanation:

The 8th World CSR Congress 2019 in Mumbai.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2354
Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.


What is the capacity of the Alaskan pipeline?

A) 2 million gallons of crude oil B) 4 million barrels of crude oil
C) 84 million gallons of crude oil D) 84 billion barrels of crude oil
 
Answer & Explanation Answer: C) 84 million gallons of crude oil

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2354