Questions

Q:

Amino acids can be distinguished from one another by

A) type of bond between the R group and the rest of the molecule B) the number of R groups found on the amino acid molecules
C) the chemical properties of their R groups D) the chemical properties of the amino and carboxyl groups
 
Answer & Explanation Answer: C) the chemical properties of their R groups

Explanation:

Amino acids are organic compounds containing amine (-NH2) and carboxyl (-COOH) functional groups, along with a side chain (R group) specific to each amino acid.

 

Depending on the nature of the side chain groups, three classes of aminoacids can e distinguished:

1. Amino acids with H ond donor and acceptor groups.

Histidine, lysine, aspartic acid, threonine,...

2. Amino acids with donor grups only.

Arginine, tryptophan and cysteine.

3. Amino acids with acceptor groups only.

Asparagine and glutamine.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 3510
Q:

Which of the following is not true about listening?

A) It involves conscious psychological action. B) Attention and meaning given to sounds turns hearing in to listening.
C) It is a passive, constant process. D) It is an active and selective process.
 
Answer & Explanation Answer: C) It is a passive, constant process.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 3509
Q:

In which Olympics India has won the most number of medals?

A) Rio Olympics 2016 B) Beijing Olympics 2008
C) London Olympics 2012 D) Athens Olympics 2004
 
Answer & Explanation Answer: C) London Olympics 2012

Explanation:

Upto now, India has won 28 medals in Olympics from 1896 - 2016. In that

 

Rio Olympics 2016  - 02

Beijing Olympics 2008 - 03

London Olympics 2012 - 06

Athens Olympics 2004 - 01

 

Hence, India has won most number of medals in 2012 Rio Olympics.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 3509
Q:

Which tennis player has won the Grand Slam title in men's singles 2019?

A) Rafael Nadal B) Roger Federer
C) Novak DJokovic D) Daniil Medvedev
 
Answer & Explanation Answer: A) Rafael Nadal

Explanation:

Rafael Nadal defeated Daniil Medvedev in the men's singles title at the 2019 US Open. It was Nadal's 19th Grand Slam singles title, and fourth US Open title.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

38 3509
Q:

When is International Talk Like a Pirate Day is observed?

A) December 11 B) September 16
C) March 8 D) September 19
 
Answer & Explanation Answer: D) September 19

Explanation:
Report Error

View Answer Report Error Discuss

37 3508
Q:

In the context of memory management, what are placement and replacement algorithms?

Answer

Placement algorithms determine where in available real-memory to load a program. Common methods are first-fit, next-fit, best-fit. Replacement algorithms are used when memory is full, and one process (or part of a process) needs to be swapped out to accommodate a new program. The replacement algorithm determines which are the partitions to be swapped out.

Report Error

View answer Workspace Report Error Discuss

3 3508
Q:

Who is the First Indian to win a medal in badminton at the Olympics ?

Answer

Saina Nehwal

Report Error

View answer Workspace Report Error Discuss

16 3507
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3507