Questions

Q:

When is International Talk Like a Pirate Day is observed?

A) December 11 B) September 16
C) March 8 D) September 19
 
Answer & Explanation Answer: D) September 19

Explanation:
Report Error

View Answer Report Error Discuss

37 3515
Q:

In the context of memory management, what are placement and replacement algorithms?

Answer

Placement algorithms determine where in available real-memory to load a program. Common methods are first-fit, next-fit, best-fit. Replacement algorithms are used when memory is full, and one process (or part of a process) needs to be swapped out to accommodate a new program. The replacement algorithm determines which are the partitions to be swapped out.

Report Error

View answer Workspace Report Error Discuss

3 3514
Q:

Cortisol is secreted by

A) Thyroid gland B) Pituitary gland
C) Adrenal gland D) Parathyroid gland
 
Answer & Explanation Answer: C) Adrenal gland

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology

6 3514
Q:

What is the common name of CaOCl2?

A) Baking Powder B) Baking Soda
C) Bleaching Powder D) Washing Soda
 
Answer & Explanation Answer: C) Bleaching Powder

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: Bank Exams

5 3513
Q:

Antonym of 'Humble'?

A) Bold B) Down-to-Earth
C) Lowly D) Modest
 
Answer & Explanation Answer: A) Bold

Explanation:

Humble means not having or showing any feelings of superiority, self-assertiveness, or showiness.

Humble means in a modest, lowly and down-to-earth manner. Not in a aggressive, bold, self confident manner.

 

Hence, in the given options Bold is an antonym of Humble.

Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE , TOEFL
Job Role: Analyst , Bank Clerk , Bank PO

1 3512
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3512
Q:

Who is the First Indian to win a medal in badminton at the Olympics ?

Answer

Saina Nehwal

Report Error

View answer Workspace Report Error Discuss

16 3512
Q:

The United Nation declared 2005-2015 as the International Decade for

A) Water for Life Decade B) Bone and Joint Decade
C) Second International Decade for the Eradication of colonialism D) International Decade for Natural Disaster Rreduction
 
Answer & Explanation Answer: A) Water for Life Decade

Explanation:
Report Error

View Answer Report Error Discuss

0 3511