Certification Questions

Q:

Go command is a signal to execute the entire batch of SQL statements after previous Go

A) TRUE B) FALSE
Answer & Explanation Answer: A) TRUE

Explanation:
Report Error

View Answer Workspace Report Error Discuss

0 3510
Q:

Your inside locals are not being translated to the inside global addresses. Which of the following commands will show you if your inside globals are allowed to use the NAT pool?

ip nat pool Corp 198.18.41.129 198.18.41.134 netmask 255.255.255.248

ip nat inside source list 100 int pool Corp overload

A) debug ip nat B) show access - list
C) show ip nat translation D) show ip nat statistics
 
Answer & Explanation Answer: B) show access - list

Explanation:

Once you create your pool, the command ip nat inside source must be used to say which inside locals are allowed to use the pool. In this question we need to see if access - list 100 is configured correctly, if at all , so show access - list is the best answer.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3503
Q:

The network address used to advertise a summary address is always which of the following?

A) The last network address in the block B) The next to last network in the block
C) The second network in the block D) The first network in the block
 
Answer & Explanation Answer: D) The first network in the block

Explanation:

The network address used to advertise a summary address is always the first network in the block

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3499
Q:

You have installed a Windows Server 2003 DNS server, but because of security reasons, you have to install this behind a firewall. What port on the firewall must be opened so that users can access the server?

A) IP and UDP port 42 B) UDP and TCP port 53
C) TCP 53 but not UDP D) PPTP and UDP 21
 
Answer & Explanation Answer: B) UDP and TCP port 53

Explanation:
Report Error

View Answer Report Error Discuss

0 3490
Q:

You are installing Windows 2000 on a computer that already has another operating system installed on it. You choose to install Windows 2000 in a different folder than the previously installed operating system. What will Windows 2000 do?

A) Abort the installation process B) Delete the previously installed operating system
C) Display an error message indicating that windows 2000 cannot be installed in a different folder D) Cause the computer to dual boot between Windows 2000 and the previously installed operating system
 
Answer & Explanation Answer: D) Cause the computer to dual boot between Windows 2000 and the previously installed operating system

Explanation:

When windows 2000 is installed in the same folder as the other operating system, Windows 2000 will delete the previously installed operating system. When Windows 2000 is installed in a different folder than the other operating system, it will automatically configure the computer to dual boot between Windows 2000 and the previously installed operating system.

Report Error

View Answer Report Error Discuss

5 3489
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3474
Q:

Subject to which prerequisites can a source of supply be assigned as early as during the MRP run?

A. The 'MRP-relevant' indicator must have been set in a contract item.

B. The source determination facility must be activated at the start of the MRP run.

C. A quota arrangement must exist and the quota arrangement usage indicator must allow use of the quota arrangement in materials planning.

D. An info record must exist for the relevant material and the vendor must have been flagged in the source list as the single/sole source of supply for the purposes of materials planning.

Answer

Answer : C , D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

7 3462
Q:

Suppose an installed z/OS customer also has Power6 Servers. They are investigating consolidation of both types of servers to z/OS.Which of the following will establish the capacity for a new z/OS server?

A) AD Tools B) CP3000
C) Estimate the AIX load and add to CP3000 results. D) Run AIX in a z/OS LPAR to establish the loadWArialTimes New RomanZ
 
Answer & Explanation Answer: C) Estimate the AIX load and add to CP3000 results.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: IBM Certification

10 3461