Q:

Identify the fields in the Data Link portion of an Ethernet frame?

Answer

The fields in the Data Link portion of a frame include the Preamble, Start Frame Delimiter, Destination MAC address, Source MAC address, Length or Type, Data, and Frame Check Sequence.

Report Error

View answer Workspace Report Error Discuss

Subject: CCNA

0 2162
Q:

What is the purpose of the LOCAL_PREF attribute?

Answer

If a router has more than one route to the same IP prefix, the best path is the one with the highest LOCAL_PREF (assuming the WEIGHT attribute for the routes is equal).

Report Error

View answer Workspace Report Error Discuss

Subject: CCNP

1 2159
Q:

You want to add an additional paging file to your Windows 2000 Server computer. Which tool should you use?

A) System B) Folder Options
C) Windows Explorer D) Add/Remove Programs
 
Answer & Explanation Answer: A) System

Explanation:

The System application is used to create, configure, and manage paging files.

Report Error

View Answer Report Error Discuss

0 2158
Q:

Project Scope Management

What are the Project Management Processes included in the Project Scope Management?

Answer

Scope Planning - Creating a project scope management plan that documents how the project scope will be defined,verified, controlled, and how the work breakdown structure (WBS) will be created and defined.


Scope Definition - Developing a detailed project scope statement as the basis for future project decisions.


Create WBS - Subdividing the major project deliverables and project work into smaller, more manageable components


Scope Verification - Formalizing acceptance of the completed project deliverables.


Scope Control - Controlling changes to the project scope.

Report Error

View answer Workspace Report Error Discuss

0 2158
Q:

For materials that require batch control, the batch number can be specified in:

A. The billing document.

B. The picking overview screen.

C. At post goods issue.

D. The sales order line item.

Answer

Answer : B , C , D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP SD

0 2155
Q:

imageview2

You are the administrator of network X. You decided to implement RIP in the following topology (click exhibit). You do not want R3 to receive RIP updates. What configuration changes need to be implemented?

A) Implement a passive-interface on R1 B) Nothing needs to be configured
C) Create a sub-interface on R1 D) Change the routing protocol to OSPF
 
Answer & Explanation Answer: A) Implement a passive-interface on R1

Explanation:

Explanation: To block RIP broadcasts on an interface connected to a subnet of a RIP-enabled network add the passive-interface command to the RIP Process

Report Error

View Answer Report Error Discuss

Filed Under: CCENT

0 2154
Q:

For most large companies, in terms of ease of network administration, what is the optimum number of Active Directory domains to use on their Windows 2000 network?

A) 1 B) 2
C) 3 D) More than 3
 
Answer & Explanation Answer: A) 1

Explanation:

Using a single domain greatly simplifies the administration of your network

Report Error

View Answer Report Error Discuss

0 2151
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Control ?

Answer

I. Inputs



  • Schedule management plan

  • Schedule baseline

  • Performance reports

  • Approved change requests


II. Tools and Techniques



  • Progress reporting

  • Schedule change control system

  • Performance measurement

  • Project management software

  • Variance analysis

  • Schedule comparision bar charts


III. Outputs



  • Schedule model data (updates)

  • Schedule baseline (updates)

  • Performance measurements

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Activity list (updates)

  • Activity attributes (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2146