Questions

Q:

The resolution of a printer is measured in

A) DPI B) Megabits
C) Hertz D) Inches
 
Answer & Explanation Answer: A) DPI

Explanation:

Dots per inch (DPI, or dpi) is a measure of spatial printing or video or image scanner dot density, in particular the number of individual dots that can be placed in a line within the span of 1 inch (2.54 cm).

Report Error

View Answer Report Error Discuss

1 2499
Q:

The combined gas law relates which of the following?

A) Volume & Temperature B) Temperature & Pressure
C) Volume & Pressure D) Volume, Temperature & Pressure
 
Answer & Explanation Answer: D) Volume, Temperature & Pressure

Explanation:

The combined gas law states that the ratio between the pressure-volume product and the temperature of a system remains constant.

 

Hence it depends on all the three Volume, Temperature & Pressure.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2499
Q:

A homogeneous mixture is also called

A) Compound B) Pure substance
C) Solution D) None of the above
 
Answer & Explanation Answer: C) Solution

Explanation:

A homogeneous mixture is also called as solution.

The term "solution" is more frequently used when a homogeneous mixture is a liquid, although it is sometimes used if the homogeneous mixture is a gas.

 

Another name for a solid homogeneous mixture of metals is an alloy.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2498
Q:

Through which conversion is energy released?

A) CO2 and H2O to C6H12O6 and O2 B) NADP+ to NADPH
C) ADP to ATP D) ATP to ADP
 
Answer & Explanation Answer: D) ATP to ADP

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2498
Q:

Which of the following is a major function of chloride?

A) Helps maintain gastric acidity B) Acts as principal intracellular electrolyte
C) Acts as principal intracellular electrolyte D) All of the above
 
Answer & Explanation Answer: A) Helps maintain gastric acidity

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2497
Q:

Cybercards are most useful for

A) writing to-do lists B) creating new inventions
C) keeping a personal diary D) tracking Internet-based research
 
Answer & Explanation Answer: D) tracking Internet-based research

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2496
Q:

A 4 kg object is moving horizontally with a speed of 5 m/s. To increase its speed to 10 m/s, the amount of net work required to be done on this object is:

A) 150 J B) 100 J
C) 50 J D) 75 J
 
Answer & Explanation Answer: A) 150 J

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: CAT , Bank Exams , AIEEE

2 2496
Q:

Importance of project life cycle?

Answer

A project has a beginning and an end and passes through several phases of development known as life cycle phases. Every project has certain phases of development. A clear understanding of these phases allows managers and executives to maintain control of the project more efficiently.
These phases are varied depending upon the industry involved but all follow the same basic steps.


 


How Important is Project Life Cycle::


1. This is a tried and tested method for delivering projects on time, within budget and to the expected quality targets.


2. Aids communication and helps define roles within the project organisation as it provides a framework for the project that is visible and understood by all members of the project.


3. The project lifecycle will allow the project manager to link progress directly to each phase and recognise the completion of each phase


4. The phases within the project lifecycle provide an understanding of the evolution of the project, being able to identify areas that need greater attention at different times such as risk management in the early stages and more Project Evaluation Reviews during the Implementation stage.


5. At each stage, approval is generally required from outside the project team before proceeding to the next stage.


6. The project life cycle also allows for the gate procedure to be used.


7. At each stage, approval is generally required from outside the project team before proceeding to the next stage.

Report Error

View answer Workspace Report Error Discuss

11 2495