Questions

Q:

The First battle of which war was the Battle of Alma?

A) Creek war B) Crimean war
C) Korean war D) Chinese war
 
Answer & Explanation Answer: B) Crimean war

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World History

2 2076
Q:

The end products of glycolysis are

A) ATP B) NADH
C) Pyruvate D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

Glycolysis involves the breaking down of a sugar into more manageable compounds in order to produce energy.

 

The net end products of glycolysis are two Pyruvate, two NADH, and two ATP.

 

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2076
Q:

A body of 4.0 kg is lying at rest. Under the action of a constant force, it gains a speed of 5 m/s. The work done by the force will be____.

A) 50J B) 30J
C) 20J D) 40J
 
Answer & Explanation Answer: A) 50J

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

0 2075
Q:

In terms of jurisdiction, the Supreme Court has

A) original and appellate B) original and executive
C) legislative and original D) executive and appellate
 
Answer & Explanation Answer: A) original and appellate

Explanation:

Original jurisdiction means that the court has the right to hear the case firsthand while appellate jurisdiction means that the court will hear an appeal that came from a court of original jurisdiction.

 

In terms of jurisdiction, the Supreme Court has Original jurisdiction and appellate jurisdiction.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

5 2075
Q:

What is process synchronization?

Answer

A situation, where several processes access and manipulate the same data concurrently and the outcome of the execution depends on the particular order in which the access takes place, is called race condition. To guard against the race condition we need to ensure that only one process at a time can be manipulating the same data. The technique we use for this is called process synchronization.

Report Error

View answer Workspace Report Error Discuss

1 2075
Q:

What's the maximum hard drive size for FAT16-based Windows system?

Answer

Maximum hard drive size for FAT16-based windows system is 2GB.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2075
Q:

Project Time Management

What are the Project Management Processes included in the Project Time Management?

Answer

Activity Definition - Identifying the Specific schedule activities that need to be performed to produce the various project deliverables.


Activity Sequencing - Identifying and documenting dependencies among schedule activities


Activity Resource Estimating - Estimating the type and quantities of resources required to perform each schedule activity


Activity Duration Estimating - Estimating the number of work periods that will be needed to complete individual schedule activities


Schedule Development - Analyzing activity sequences, durations, resource requirements, and schedule constraints to creae the project schedule.


Schedule Control - Controlling changes to the project schedule

Report Error

View answer Workspace Report Error Discuss

0 2075
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Estimating ?

Answer

I. Inputs



  • Enterprise environmental factors

  • Organizational process assets 

  • Project scope statement

  • Work breakdown structure

  • WBS dictionary 

  • Project management plan


             - Schedule management plan


             - Staffing management plan


             - Risk register


II. Tools and Techniques



  • Analogous estimating

  • Determine resource cost rates

  • Bottom-up estimating

  • Parametric estimating

  • Project management software

  • Vendor bid analysis

  • Reserve analysis

  • Cost of quality


III. Outputs



  • Activity cost estimates 

  • Activity cost estimate supporting detail 

  • Requested changes

  • Cost management plan (updates)