Questions

Q:

Where does protein synthesis take place?

A) Nucleus B) Ribosomes
C) On the cell wall D) All of the above
 
Answer & Explanation Answer: B) Ribosomes

Explanation:

Protein synthesis take place in the cytoplasm where ribosomes are located as they are the machinery which are responsible for the protein synthesis.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 2258
Q:

Which waves cannot be transmitted through vacuum?

A) Electromagnetic B) Light
C) Sound D) Heat
 
Answer & Explanation Answer: C) Sound

Explanation:

Sound waves cannot be transmitted through vacuum. 

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

6 2257
Q:

There were 42 students in a hostel. Due to the admission of 13 new students, the expenses of the mess increase by Rs. 30 per day while the average expenditure per head diminished by Rs. 3. What was the original expenditure of the mess ?

A) Rs. 630 B) Rs. 580
C) Rs. 470 D) Rs. 690
 
Answer & Explanation Answer: A) Rs. 630

Explanation:
Report Error

View Answer Report Error Discuss

0 2257
Q:

What is risk analysis? What does it have to do with Severity and Priority?

Answer

Risk analysis is a method to determine how much risk is involved in something. In testing, it can be used to determine when to test something or whether to test something at all. Items with higher risk values should be tested early and often. Items with lower risk value can be tested later, or not at all. It can also be used with defects. Severity tells us how bad a defect is: "how much damage can it cause?" Priority tells us how soon it is desired to fix the defect: "should we fix this and if so, by when?"


Defects with High Severity and Priority are tested first.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 2257
Q:

Benefits of Software Quality Assurance to the organization

Answer

The main task of Software Quality Assurance Group is to examine the overall s/w development process and to create and enforce standards and methods to improve it with the goal of preventing bugs from ever occurring. With this definition, it is imperative that the QA helps an organization in continuous performance improvement and strive for perfection.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

0 2256
Q:

Which European Country provide its currency for Bank of Central African states

A) France B) UK
C) Netherlands D) Germany
 
Answer & Explanation Answer: A) France

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Organisations

1 2256
Q:

The Highest navigable lake in the world is 

A) Huron B) Titicaca
C) Superior D) Tanganyika
 
Answer & Explanation Answer: B) Titicaca

Explanation:

The Lake is located in the Andes mountains near Bolivia-Peru border at a height of 3810 m. It is also the largest lake in South America.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography

0 2256
Q:

What is the Focus of an Earthquake?

Answer

A Focus of an earthquake is the location where the earthquake begins. The ground ruptures at this spot, then seismic waves radiate outward in all directions.

At this focus point, the release of energy due to faulting actually occurs during an earthquake. The point directly above the focus on the surface is called Epicenter.


The focus is also called as Hypocenter as it is the synonym of the focus.

Report Error

View answer Workspace Report Error Discuss

Subject: General Awareness Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

3 2256