Questions

Q:

Prime Minister Narendra Modi inaugurated India's first Multi-Modal Terminal on which river?

A) Ganga B) Godavari
C) Yamuna D) Krishna
 
Answer & Explanation Answer: A) Ganga

Explanation:

Prime Minister Narendra Modi inaugurated India's first Multi-Modal Terminal on The Ganga river.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2125
Q:

Soil that forms on unconsolidated deposits is called

A) humus B) bedrock
C) transported soil D) residual soil
 
Answer & Explanation Answer: C) transported soil

Explanation:

Transported soils form from weathered material deposits, which are transported by natural forces to a new site, away from the site of origin.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 2125
Q:

Centrifugal force increases with

A) Temperature B) Pressure
C) Acceleration D) Humidity
 
Answer & Explanation Answer: C) Acceleration

Explanation:

Centrifugal force is the fictitious force that pulls out from the center on the body we feel while moving in the circular path. It increases with the rate of rotation of the axis i.e, acceleration of the body.

 

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2124
Q:

When was Postal Index Number (PIN) or PIN Code introduced in India?

A) 1974 B) 1973
C) 1972 D) 1971
 
Answer & Explanation Answer: C) 1972

Explanation:

PIN (Postal Index Number) was introduced in INDIA on August 15, 1972. This is the coding system used by postal services of India for different areas. Totally in our country there are 9 divisions, of which 8 are geographical & 9th is reserved to army.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

5 2124
Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

We set out for the gallows. Two warders marched on either side of the prisoner, with their rifles at the slope; two others marched close against him, gripping him by his arm and shoulder, as though, at once pushing and supporting him. The rest of us, magistrates and the like, followed behind. Suddenly, when we had gone ten yards, the procession stopped short without any order or warning. A dreadful thing had happened ­ a dog, come goodness knows whence, had appeared in the yard. It came bounding among us with a loud volley of barks, and leapt round us wagging its whole body, wild with glee at finding so many human beings together. It was a large woolly dog, half Airedale, half Pariah. For a moment, it pranced round us, and then, before anyone could stop it, it had made a dash for the prisoner, and jumping up tried to lick his face. Everyone stood aghast, too taken aback even to grab at the dog.

How did the arrival of the dog change the atmosphere of the event?

A) It caused the people to scatter B) It allowed the prisoner to escape
C) It saddened the prisoner even more D) It stunned everyone present there
 
Answer & Explanation Answer: D) It stunned everyone present there

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2124
Q:

Project Integration Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Develop Project Charter phase?

Answer

I. Inputs



  • Contract (when applicable)

  • Project statement of work

  • Enterprise environmental factors

  • Organizational process assets


II. Tools and Techniques



  • Project selection methods

  • Project management methodology

  • Project management information system

  • Expert Judgment


III. Outputs


         1. Project charter

Report Error

View answer Workspace Report Error Discuss

0 2124
Q:

Project Communications Management

What are the Project Management Processes included in the Project Communications Management?

Answer

Communications planning - Determining the information and communications needs of the project stakeholders.


Information Distribution - Making needed information available  to project stakeholders in a timely manner.


Performance Reporting - Collecting and distributing performance information. This includes status reporting, progress measurement, and forecasting.


Manage Stakeholders - Managing communications to satisfy the requirements of and resolve issues with project stakeholders.

Report Error

View answer Workspace Report Error Discuss

0 2124
Q:

What is the difference in writing the test cases for Integration testing and system testing?

Answer

Integration testing is done at module level when various modules are integrated with each other to form a system or sub-system. Its main purpose is to ensure that interfaces between various modules are working properly; i.e. modules which are working individually are also working correctly together.


System testing is done on a complete, integrated system to evaluate the system’s compliance with its specified requirements. It validates that the system meets its functional and non-functional requirements.


From these definitions, it is clear that the purpose of Integration and purpose of System Testing are different. Therefore, Integration test cases focus more on the interfaces between modules (interface integrity) - the data transfer and their interaction with each other. System test cases focus on testing the product as a whole; i.e. whether the functional, non-functional requirements of the System are met or not. Since System Testing is the final phase before delivery of the product, System test cases should pinpoint configuration related errors along with testing for performance, security, reliability etc.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 2123