Questions

Q:

In Which state is the highest dam found in India ?

Answer



Tehri Dam on Bhagirathi River in Uttarakhand (Height of 260 meters)


 

Report Error

View answer Workspace Report Error Discuss

4 3235
Q:

Infection of salivary glands by a virus leads to 

A) tetanus B) mumps
C) pyorrhoea D) ulcers
 
Answer & Explanation Answer: B) mumps

Explanation:

Mumps : This is a swelling caused by information of parotid glands placed in front of our ear region. The inflammation is caused by a virus.

Report Error

View Answer Report Error Discuss

Filed Under: Biology

3 3234
Q:

What structure separates the colon from the small intestine?

what_structure_separates_the_colon_from_the_small_intestine1539329010.jpg image

A) ileocecal valve B) Epiglottis
C) Sphincter D) None of the above
 
Answer & Explanation Answer: A) ileocecal valve

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 3233
Q:

How many hours does it take for a housefly's egg to hatch?

Answer

24 hours

Report Error

View answer Workspace Report Error Discuss

Subject: General Science

15 3233
Q:

What is a daemon?

Answer

Daemon is a program that runs in the background without user’s interaction. A daemon runs in a multitasking operating system like UNIX. A daemon is initiated and controlled by special programs known as ‘processes’.

Report Error

View answer Workspace Report Error Discuss

0 3233
Q:

Verify Scope is the process of

A) progressively elaborating and documenting the project work that produces the product of the project. B) subdividing the major product deliverables into smaller, more manageable components.
C) obtaining formal acceptance of the project scope by the stakeholders. D) influencing the factors that create scope changes to ensure that changes are agreed upon, determining that a scope change has occurred and managing the changes when and if they occur.
 
Answer & Explanation Answer: C) obtaining formal acceptance of the project scope by the stakeholders.

Explanation:

“Verify Scope is the process of formalizing acceptance of the completed project deliverables. Verifying scope includes reviewing deliverables with the customer or sponsor to ensure that they are completed satisfactorily and obtaining formal acceptance of deliverables by the customer or sponsor.” PMBOK [5.4]

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3233
Q:

I can grow quickly and I can die slowly, I can be a terrible pain or a comfort and joy. You never find me all by myself. What am I?

Answer

A relationship.

Report Error

View answer Workspace Report Error Discuss

Subject: Word Puzzles Exam Prep: Bank Exams
Job Role: Bank Clerk

7 3232
Q:

What is Bandwidth?

Answer

Every line has an upper limit and a lower limit on the frequency of signals it can carry. This limited range is called the bandwidth

Report Error

View answer Workspace Report Error Discuss

Subject: Networking
Job Role: Network Engineer

1 3232