Exams


Q:

Study the following figure and answer the questions given below.

 

 

By which number, the trained married lecturers in the college are represented?

A) 7 B) 6
C) 5 D) 4
 
Answer & Explanation Answer: C) 5

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Logical Venn Diagram
Exam Prep: Bank Exams

1 11209
Q:

What is the theme of the ‘World Wetlands Day 2021’?

 

A) Wetlands and Water B) Wetlands for Us
C) Save Wetlands D) Wetlands and Covid
 
Answer & Explanation Answer: A) Wetlands and Water

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Important Days and Years
Exam Prep: Bank Exams

2 11205
Q:

An object that has kinetic energy must be

A) At an elevated position B) Falling
C) At rest D) Moving
 
Answer & Explanation Answer: D) Moving

Explanation:

In physics, we know that the kinetic energy of an object is the energy that it possesses due to its motion. It is defined as the work needed to accelerate a body of a given mass from rest to its stated velocity.

Hence, An object that has kinetic energy must be in motion i.e, moving.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank Clerk , Bank PO

10 11202
Q:

1 Billion Seconds Equals to

A) 34.76 years B) 32.48 years
C) 33.31 years D) 31.68 years
 
Answer & Explanation Answer: D) 31.68 years

Explanation:

We know that 1 year = 365.25 days

1 day = 24 hours

1 hour = 60 minutes

1 minute = 60 seconds

 

=> 1 Year = 365.25 x 24 x 60 x 60 Seconds

But 1 billion seconds = ?

1 Year = 365.25 x 24 x 60 x 60 Seconds

    ?     =  1000000000 Seconds

 

? = 1000000000365.25 x 24 x 60 x 60 years = 31. 68 years.

 

Report Error

View Answer Report Error Discuss

39 11179
Q:

If radius and height of a cylinder increase by 20% and15% respectively. then what is the % change in curved surface area?

A) 41% B) 38%
C) 33% D) 44%
 
Answer & Explanation Answer: B) 38%

Explanation:

% Change in Curved Surface Area is given by 

%Change in radius + %Change in height + %Change in radius × %Change in height 100  

+20 + 15 + 20×15100 = 38%

Report Error

View Answer Report Error Discuss

Filed Under: Volume and Surface Area
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

20 11174
Q:

Identify the diagram that best represents the relationship among classes given below:

Professors, post graduates & employed.

A) 1 B) 2
C) 3 D) 4
 
Answer & Explanation Answer: C) 3

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Logical Venn Diagram
Exam Prep: Bank Exams

1 11171
Q:

Total number of students in 3 classes of a school is 333 . The number of students in class 1 and 2 are in 3:5 ratio and 2 and 3 class are 7:11 ratio . What is the strength of class that has highest number of students ?

A) 125 B) 155
C) 135 D) 165
 
Answer & Explanation Answer: D) 165

Explanation:

Ratio C1:C2 = 3:5 and C2:C3 = 7:11
So C1:C2:C3 = 21 : 35 : 55
Let the strength of three classes are 21x, 35x and 55x respectively, then
Given that 21x + 35x + 55x = 333
=> 111x = 333 or x=3
So strength of the class with highest number of students =55x = 55x3 = 165.

Report Error

View Answer Report Error Discuss

Filed Under: Ratios and Proportions
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk

10 11170
Q:

50 men can build a tank in 40days, but though they begin the work together, 5 men quit every ten days. The time needed to build the tank is ?

A) 50 days B) 48 days
C) 47.5 days D) 49 days
 
Answer & Explanation Answer: A) 50 days

Explanation:

50 men can build a tank in 40 days 

Assume 1 man does 1 unit of work in 1 day

Then the total work is 50×40 = 2000 units

 

50 men work in the first 10 days and completes 50×10 = 500 units of work

45 men work in the next 10 days and completes 45×10 = 450 units of work

40 men work in the next 10 days and completes 40×10 = 400 units of work

35 men work in the next 10 days and completes 35×10 = 350 units of work

So far 500 + 450 + 400 + 350 = 1700 units of work is completed and

 

Remaining work is 2000 - 1700 = 300 units

 

30 men work in the next 10 days. In each day, they does 30 units of work.

 

Therefore, additional days required = 300/30 =10

 

Thus, total 10+10+10+10+10 = 50 days required.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

13 11167