Exams


Q:

A source program is the program written in which level language  ?

A) Alpha Numeric B) High-Level
C) Symbolic D) Machine
 
Answer & Explanation Answer: B) High-Level

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Programming
Exam Prep: Bank Exams
Job Role: Analyst , Database Administration , IT Trainer

15 10937
Q:

The modulus of elasticity for mild steel is approximately equal to

A) 210 kN/mm2 B) 100 kN/mm2
C) 80 kN/mm2 D) 10 kN/mm2
 
Answer & Explanation Answer: A) 210 kN/mm2

Explanation:

It is useful to have a property of a material that is independent of the size of the sample and can be use to compare its elastic properties with another - this is called the Modulus of Elasticity for the material.

The modulus of elasticity is defined as:

 

Modulus of elasticity = Stress / Strain

 

There are three types of moduli. They are :

(a) the Young Modulus - tensile and compression longitudinal stress

(b) the shear modulus - a shearing stress

(c) the bulk modulus - volume changes of the specimen.

 

mod-compressor1528180544.jpg image

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

2 10931
Q:

Total number of students in 3 classes of a school is 333 . The number of students in class 1 and 2 are in 3:5 ratio and 2 and 3 class are 7:11 ratio . What is the strength of class that has highest number of students ?

A) 125 B) 155
C) 135 D) 165
 
Answer & Explanation Answer: D) 165

Explanation:

Ratio C1:C2 = 3:5 and C2:C3 = 7:11
So C1:C2:C3 = 21 : 35 : 55
Let the strength of three classes are 21x, 35x and 55x respectively, then
Given that 21x + 35x + 55x = 333
=> 111x = 333 or x=3
So strength of the class with highest number of students =55x = 55x3 = 165.

Report Error

View Answer Report Error Discuss

Filed Under: Ratios and Proportions
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk

10 10927
Q:

A house owner wants to get his house painted. He is told that this would require 45 kg of paint allowing 6% wasting. And if the paint is available in 4 kg tins only, the number of tins required for painting the house is ?

A) 12 B) 13
C) 11 D) 10
 
Answer & Explanation Answer: A) 12

Explanation:

Given 45 kg for painting 

And 6% 0f 45 for wasting => 6x45/100 = 2.7 kg

Now total paint required = 45+2.7 = 47.7 kgs

But tins are available in only 4kgs

Then, no. of tins req = 47.7/4 = 11.4 => 12 tins

Report Error

View Answer Report Error Discuss

Filed Under: Percentage
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

14 10924
Q:

 

The given graph shows the registration of bikes and total vehicles (in thousands) for 6 months in 2017 in City X.

 

Note : In the chart, the first number represents bikes (grey) and the second number represents total vehicles (black).

 

Based on the given data, in March 2017, the number of vehicles other than bikes registered is

 

A) 15000 B) 10000
C) 9000 D) 11000
 
Answer & Explanation Answer: B) 10000

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Bar Charts
Exam Prep: Bank Exams

0 10901
Q:

If two is subtracted from each odd digit and three is added to each even digit in the number 94257636, how many digits will appear twice in the new number thus formed ?

A) 0 B) 1
C) 2 D) 3
 
Answer & Explanation Answer: D) 3

Explanation:

EXP.

Here 5, 7 & 9 are repeating after modulation.

Report Error

View Answer Report Error Discuss

Filed Under: Arithmetical Reasoning
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

16 10895
Q:

Find the total number of cubes in the given figure ?

              Untitled-11484632107.jpg image

A) 56 B) 60
C) 64 D) 72
 
Answer & Explanation Answer: A) 56

Explanation:

(Total numbers of cubes in a line  x  Number of stack / tower) + ...

= (6x1)+(5x2)+(4x3)+(3x4)+(5x2)+(6x1)

= 6+10+12+12+10+6 = 56

Report Error

View Answer Report Error Discuss

Filed Under: Cubes and Dice
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

47 10886
Q:

50 men can build a tank in 40days, but though they begin the work together, 5 men quit every ten days. The time needed to build the tank is ?

A) 50 days B) 48 days
C) 47.5 days D) 49 days
 
Answer & Explanation Answer: A) 50 days

Explanation:

50 men can build a tank in 40 days 

Assume 1 man does 1 unit of work in 1 day

Then the total work is 50×40 = 2000 units

 

50 men work in the first 10 days and completes 50×10 = 500 units of work

45 men work in the next 10 days and completes 45×10 = 450 units of work

40 men work in the next 10 days and completes 40×10 = 400 units of work

35 men work in the next 10 days and completes 35×10 = 350 units of work

So far 500 + 450 + 400 + 350 = 1700 units of work is completed and

 

Remaining work is 2000 - 1700 = 300 units

 

30 men work in the next 10 days. In each day, they does 30 units of work.

 

Therefore, additional days required = 300/30 =10

 

Thus, total 10+10+10+10+10 = 50 days required.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

13 10884