Exams


Q:

A room is 15 feet long and 12 feet broad. A mat has to be placed on the floor of the room leaving 1.5 feet space from the walls. What will be the cost of the mat at the rate of Rs. 3.50 per squire feet?

A) 378 B) 472.5
C) 496 D) 630
 
Answer & Explanation Answer: A) 378

Explanation:

Untitled1515321292.png image

Report Error

View Answer Report Error Discuss

Filed Under: Area
Exam Prep: Bank Exams
Job Role: Bank PO

25 8532
Q:

If logx916 = -12, then the value of x?

A) -3/4 B) 3/4
C) 81/256 D) 256/81
 
Answer & Explanation Answer: D) 256/81

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Logarithms
Exam Prep: Bank Exams
Job Role: Bank PO

88 8532
Q:

P and Q can do a work in 4 hours and 12 hours respectively. P starts the work at 9am and they work alternately for one hour each. When will the work be completed ?

A) 3 am B) 12 pm
C) 1 pm D) 3 pm
 
Answer & Explanation Answer: D) 3 pm

Explanation:

Work done by P and Q in the first two hours, working alternately

= First hour P + Second hour Q

14+112=13

work is completed in 2 hours

Then, the total time required to complete the work by P and Q working alternately=2 x 3= 6hours

Thus, work will be completed at 3pm.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

10 8531
Q:

In a mens hostel, there were 95 students. To accommodate 30 more students the average is decreased by rupees 5. But total expenditure increased by Rs.500. Find the total expenditure of the hostel now ?

A) Rs. 4680 B) Rs. 4420
C) Rs. 4960 D) Rs. 5480
 
Answer & Explanation Answer: A) Rs. 4680

Explanation:

Let the expenditure on the 95 students be 'x'

Then,

95x + 500 = 120(x – 5)
95x + 500 = 120x - 600
120x - 95x = 1100
25x = 1100
=> x = 44

Therefore, total expenditure of the hostel becomes
95 x 44 + 500 = 4680.

Report Error

View Answer Report Error Discuss

Filed Under: Average
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

18 8529
Q:

Raghu can complete a work in 12days working 9 hours a day. Arun can complete the same work in 8 days working 11 hours a day. If both Raghu and Arun work together, working 12 hours a day, in how many days can they complete the work ?

A)3449 days   

B)12449 days 

C)4349 days    

D)41249 days

A) Option A B) Option B
C) Option C D) Option D
 
Answer & Explanation Answer: C) Option C

Explanation:

Raghu can complete the work in (12 x 9)hrs = 108 hrs.

 

 Arun can complete the work in (8 x 11)hrs = 88 hrs.

 

Raghu's 1 hrs work = 1/108 and Arun's 1 hrs work = 1/88

 

(Raghu + Arun)'s 1 hrs work = 1108+188=492376

 
So, both Raghu and Arun will finish the work in 237649 hrs

Number of days of 12 hours each=237649×112 = 19849=4349 days

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

6 8525
Q:

One-third of the boys and one-half of the girls of a college participated in a sport. If the number of participating students is 300, out of which 100 are boys. What is the total number of students in the college?

A) 500 B) 300
C) 600 D) 700
 
Answer & Explanation Answer: D) 700

Explanation:

Let number of boys in the school = x

Let number of girls in the school = y

Number of students participated in the sports = 300

Out of which boys = 100

but given number of boys participated in sports = x/3

=> x/3 = 100

=> x = 300

Remaining girls = 300 - 100 = 200

=> y/2 = 200

=> y = 400

Therefore, total number of students in the school = x + y = 300 + 400 = 700

Report Error

View Answer Report Error Discuss

Filed Under: Percentage
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

15 8523
Q:

The given problem figure is embedded in one of the given Answer Figures. Which is that Answer Figure?

 

A) C B) D
C) B D) A
 
Answer & Explanation Answer: C) B

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Analytical Reasoning
Exam Prep: Bank Exams

2 8523
Q:

What is the main function of an ignition safety switch?

Answer

An ignition safety switch is a safety device can shut off the engine if the operator falls off the PWC or out of the powerboat, or is otherwise thrown from the proper operating position.


 


How it works:


It allows the engine of the vehicle to shut off or to be turned off immediately as it is to prevent further complications to happen as this is being used when an emergency is launched


 


Where it is used:


Most powerboats and PWCs come equipped by the manufacturer with an emergency engine cut-off switch.

Report Error

View answer Workspace Report Error Discuss

Subject: Physics Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

6 8517