CAT Questions

Q:

Greek Roman art has found a place in

A) Buddhist Art B) Ellora
C) Kalinga D) Gandhara
 
Answer & Explanation Answer: A) Buddhist Art

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

8 5924
Q:

What is the systematic name of PbO?

A) Plumbic oxide B) Lead oxide
C) Lead(II) oxide D) All of the above
 
Answer & Explanation Answer: C) Lead(II) oxide

Explanation:

The systematic name for a chemical is the unique name given to it by the International Union of Pure Applied Chemistry (IUPAC). The IUPAC name can differ from a chemical compound's general name.

 

PbO is an ionic compound since it consists of a Lead as metal and Oxygen as nonmetal. The systematic name for PbO is Lead (II) oxide. Here we need to put the (II) since lead has more than one combining capacity.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 5919
Q:

India's first-ever test flight powered by biojet fuel was successfully conducted by which airline?

A) Air India B) Spice Jet
C) Kingfishers D) None of the above
 
Answer & Explanation Answer: B) Spice Jet

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 5918
Q:

Which state in India has the maximum number of wildlife sanctuaries?

A) Madhya Pradesh B) Odisha
C) Uttar Pradesh D) Andhra Pradesh
 
Answer & Explanation Answer: A) Madhya Pradesh

Explanation:

Madhya Pradesh state has the maximum number of wildlife sanctuaries in India. It has total of 36 wildlife sanctuaries. In India, there are total 96 national parks and 510 wildlife sanctuaries.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

9 5909
Q:

Karthik walks at 5 km/hr and reaches his destination 8 min late. If he walks at 6 km/hr, he reaches his destination on time. What distance he will cover in given time ?

A) 10 kms B) 8 kms
C) 6 kms D) 4 kms
 
Answer & Explanation Answer: D) 4 kms

Explanation:

Let the actual distance be t kms

Now, According to the data,

 

5t + 860 = 6t=> 560t + 860 = 6t=> 60t + 8 = 72t=> 8 = 12t=> t = 8/12 = 2/3 hrs

 

Now, the total distance = 6t = 6 x 2/3 = 2 x 2 = 4 kms.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Distance
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

17 5907
Q:

When 0.46 is written in simplest form, the sum of the numerator and the denominator is  ?

A) 69 B) 73
C) 96 D) 41
 
Answer & Explanation Answer: B) 73

Explanation:

0.46 = 46/100 = 23/50.

Sum of the numerator and denominator is 23 + 50 = 73

Report Error

View Answer Report Error Discuss

Filed Under: Decimal Fractions
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

8 5907
Q:

Which of the following definitions describes a physical hazard?

A) The most commonly thought of hazard in construction. This hazard includes radiation, extreme temperatures, noise, and vibration. B) These hazards can lead to injuries to the joints or muscles by way of heavy, frequent lifting, repetitive tasks.
C) Can be present in dust, fumes, liquids, solids, mists, vapors, or gases of products used at a site or released during a construction job D) Microorganisms, such as bacteria, fungus, mold, or viruses that can cause illness.
 
Answer & Explanation Answer: A) The most commonly thought of hazard in construction. This hazard includes radiation, extreme temperatures, noise, and vibration.

Explanation:

A physical hazard is defined as "A factor within the environment that can harm the body without necessarily touching it."

Vibration and noise are examples of physical hazards.

 

Physical hazards include but aren't limited to electricity, radiation, pressure, noise, heights and vibration amongst many others.

 

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

5 5906
Q:

K is 4 times as fast as L and working together, they can complete a work in 24 days. In how many days can L alone complete the work ?

A) 30 days B) 40 days
C) 120 days D) 80 days
 
Answer & Explanation Answer: A) 30 days

Explanation:

Given K=4L 

-->K+L = 4L+L = 5L

 

These 5L people can complete the work in 24 days, which means L alone can do the work in (24 x 5)=120 days.

 

Hence, K alone can do the work in 120/4= 30 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

4 5900