CAT Questions

Q:

The shadow zone exists because

Answer

The shadow zone is the area of the earth from angular distances of 104 to 140 degrees from a given earthquake that does not receive any direct P waves. The shadow zone results from S waves being stopped entirely by the liquid core and P waves being bent (refracted) by the liquid core.


There are two types of Shadow zones:


one for P waves and


one for S waves.


shadow-zones1532150666.jpg image


 


P wave shadows between 104-140 degree, both sides; S wave shadow from 105 of one side to 105 of the other.

Report Error

View answer Workspace Report Error Discuss

Subject: General Science Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 5326
Q:

Pressing F8 key for three times selects

A) a sentence B) a word
C) a document D) a paragraph
 
Answer & Explanation Answer: A) a sentence

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

8 5323
Q:

What is the new name of Abyssinia?

A) Namibia B) Zimbabwe
C) Thailand D) Ethiopia
 
Answer & Explanation Answer: D) Ethiopia

Explanation:

Ethiopia is the new name of a country which is historically called as Abyssinia.

 

New name     -      Old name

Namibia        -      South West Africa

Zimbabwe     -      Southern Rhodesia

Thailand        -      Siam.

Report Error

View Answer Report Error Discuss

Filed Under: Country Capitals
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

9 5321
Q:

The difference of two numbers is 1365. On dividing the larger number by the smaller, we get 6 as quotient and 15 as remainder. What is the smaller number  ?

A) 270 B) 1270
C) 350 D) 720
 
Answer & Explanation Answer: A) 270

Explanation:

Let the smallest number be x.
Then larger number = (x + 1365)
x + 1365 = 6x + 15
= 5x = 1350
x = 270
Smaller number = 270.

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Numbers
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

6 5313
Q:

The G.C.D of 1.08, 0.36 and 0.9 is

A) 0.9 B) 0.36
C) 0.18 D) 1.08
 
Answer & Explanation Answer: C) 0.18

Explanation:

G.C.D is nothing but H.C.F

 

Given numbers are 1.08 , 0.36 and 0.90

 

we can take as 108, 36 and 90 

 

Then required H.C.F is 18.

 

Therefore, H.C.F of given numbers is 0.18.

Report Error

View Answer Report Error Discuss

Filed Under: HCF and LCM
Exam Prep: TOEFL , GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

19 5312
Q:

Synonym for the word : Bleak

A) bare B) lush
C) warm D) verdant
 
Answer & Explanation Answer: A) bare

Explanation:

Bleak means an area of land lacking vegetation and exposed to the elements like deserts.

Report Error

View Answer Report Error Discuss

Filed Under: Analogy
Exam Prep: AIEEE , Bank Exams , CAT , GRE , TOEFL
Job Role: Bank Clerk , Bank PO

16 5309
Q:

I am an 8 letter word.

First 4 is the question.

2, 3, 4 protects our head.

5, 6, 7 IT company name.

7 & 8 are the same letters.

Who am I?

Answer

That 8 letter word is Whatsapp (a messenger app)


First four letters:   WHAT a question
 
Letters 2,3,4:     HAT protects our head

Letters 5,6,7:   SAP an IT company

Letters 7,8:    PP same.

Report Error

View answer Workspace Report Error Discuss

9 5308
Q:

A,B,C can complete a work in 15,20 and 30 respectively.They all work together for two days then A leave the work,B and C work some days and B leaves 2 days before completion of that work.how many days required to complete the whole work?

Answer

Given A,B,C can complete a work in 15,20 and 30 respectively.


The total work is given by the LCM of 15, 20, 30 i.e, 60.


A's 1 day work = 60/15 = 4 units


B's 1 day work = 60/20 = 3 units


C's 1 day work = 60/30 = 2 units


(A + B + C) worked for 2 days = (4 + 3 + 2) 2 = 18 units


 Let B + C worked for x days = (3 + 2) x = 5x units


C worked for 2 days = 2 x 2 = 4 units


Then, 18 + 5x + 4 = 60


22 + 5x = 60


5x = 38


x = 7.6


 


Therefore, total number of days taken to complete the work = 2 + 7.6 + 2 = 11.6 = 11 3/5 days.

Report Error

View answer Workspace Report Error Discuss

Subject: Time and Work Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

10 5306