GATE Questions

Q:

A house owner wants to get his house painted. He is told that this would require 45 kg of paint allowing 6% wasting. And if the paint is available in 4 kg tins only, the number of tins required for painting the house is ?

A) 12 B) 13
C) 11 D) 10
 
Answer & Explanation Answer: A) 12

Explanation:

Given 45 kg for painting 

And 6% 0f 45 for wasting => 6x45/100 = 2.7 kg

Now total paint required = 45+2.7 = 47.7 kgs

But tins are available in only 4kgs

Then, no. of tins req = 47.7/4 = 11.4 => 12 tins

Report Error

View Answer Report Error Discuss

Filed Under: Percentage
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

14 10920
Q:

If two is subtracted from each odd digit and three is added to each even digit in the number 94257636, how many digits will appear twice in the new number thus formed ?

A) 0 B) 1
C) 2 D) 3
 
Answer & Explanation Answer: D) 3

Explanation:

EXP.

Here 5, 7 & 9 are repeating after modulation.

Report Error

View Answer Report Error Discuss

Filed Under: Arithmetical Reasoning
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

16 10892
Q:

The modulus of elasticity for mild steel is approximately equal to

A) 210 kN/mm2 B) 100 kN/mm2
C) 80 kN/mm2 D) 10 kN/mm2
 
Answer & Explanation Answer: A) 210 kN/mm2

Explanation:

It is useful to have a property of a material that is independent of the size of the sample and can be use to compare its elastic properties with another - this is called the Modulus of Elasticity for the material.

The modulus of elasticity is defined as:

 

Modulus of elasticity = Stress / Strain

 

There are three types of moduli. They are :

(a) the Young Modulus - tensile and compression longitudinal stress

(b) the shear modulus - a shearing stress

(c) the bulk modulus - volume changes of the specimen.

 

mod-compressor1528180544.jpg image

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

2 10885
Q:

If the HCF of 210 and 55 is expressible in the form of 210 x 5 + 55P, then value of P = ?

A) -23 B) 27
C) 16 D) -19
 
Answer & Explanation Answer: D) -19

Explanation:

HCF of 210 and 55 is 5

Now, 210x5 + 55P = 5

=> 1050 + 55P = 5

=> 55P = -1045

=> P = -1045/55

=> P = -19.

Report Error

View Answer Report Error Discuss

Filed Under: HCF and LCM
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

28 10875
Q:

An object that has kinetic energy must be

A) At an elevated position B) Falling
C) At rest D) Moving
 
Answer & Explanation Answer: D) Moving

Explanation:

In physics, we know that the kinetic energy of an object is the energy that it possesses due to its motion. It is defined as the work needed to accelerate a body of a given mass from rest to its stated velocity.

Hence, An object that has kinetic energy must be in motion i.e, moving.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank Clerk , Bank PO

10 10858
Q:

50 men can build a tank in 40days, but though they begin the work together, 5 men quit every ten days. The time needed to build the tank is ?

A) 50 days B) 48 days
C) 47.5 days D) 49 days
 
Answer & Explanation Answer: A) 50 days

Explanation:

50 men can build a tank in 40 days 

Assume 1 man does 1 unit of work in 1 day

Then the total work is 50×40 = 2000 units

 

50 men work in the first 10 days and completes 50×10 = 500 units of work

45 men work in the next 10 days and completes 45×10 = 450 units of work

40 men work in the next 10 days and completes 40×10 = 400 units of work

35 men work in the next 10 days and completes 35×10 = 350 units of work

So far 500 + 450 + 400 + 350 = 1700 units of work is completed and

 

Remaining work is 2000 - 1700 = 300 units

 

30 men work in the next 10 days. In each day, they does 30 units of work.

 

Therefore, additional days required = 300/30 =10

 

Thus, total 10+10+10+10+10 = 50 days required.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

13 10846
Q:

What could cause a Fixed Disk Error?

A) Slow Processor Speed B) RAM Space
C) Incorrect CMOS Settings D) None
 
Answer & Explanation Answer: C) Incorrect CMOS Settings

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: Bank Exams , CAT , GATE
Job Role: Analyst , Bank PO , Database Administration , IT Trainer

24 10844
Q:

Properly arranged data is called

A) Information B) File
C) Field D) Words
 
Answer & Explanation Answer: A) Information

Explanation:
Report Error

View Answer Report Error Discuss

20 10837