Questions

Q:

Which of the following languages is a Slavic Language?

A) Polish B) Flemish
C) Romanian D) Gaelic
 
Answer & Explanation Answer: A) Polish

Explanation:

Slavic languages, also called Slavonic languages, a subfamily of the Indo-European family of languages Eastern European ethnic group, commonly associated with Russia, the Baltic States, and other Eastern European countries. peoples of the lands of today's Eastern Europe and Russia have excited curiosity and beckoned visitors.

Key to these peoples and cultures are the Slavic languages:

1. Russian,

2. Ukrainian,

3. Polish,

4. Czech, and

5. Bosnian/Croatian/Serbian.

 

  • Flemish is the language of many Belgians.
  • Romanians are more Hungarian or Balkans-affiliated than Russian.
  • Gaelic is the language of the Celts (Scotland/Ireland).
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

7 3508
Q:

Amino acids can be distinguished from one another by

A) type of bond between the R group and the rest of the molecule B) the number of R groups found on the amino acid molecules
C) the chemical properties of their R groups D) the chemical properties of the amino and carboxyl groups
 
Answer & Explanation Answer: C) the chemical properties of their R groups

Explanation:

Amino acids are organic compounds containing amine (-NH2) and carboxyl (-COOH) functional groups, along with a side chain (R group) specific to each amino acid.

 

Depending on the nature of the side chain groups, three classes of aminoacids can e distinguished:

1. Amino acids with H ond donor and acceptor groups.

Histidine, lysine, aspartic acid, threonine,...

2. Amino acids with donor grups only.

Arginine, tryptophan and cysteine.

3. Amino acids with acceptor groups only.

Asparagine and glutamine.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 3508
Q:

When more than 20% of the body weight is due to fat, the person is suffering from

A) Marasmus B) Kwashiorkor
C) Scurvy D) Obesity
 
Answer & Explanation Answer: D) Obesity

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology

5 3507
Q:

I always run but never walk, often murmur, never talk, have a bed but never sleep, have a mouth but never eat. Who am I?

I_always_run_but_never_walk,_often_murmur,_never_talk,_have_a_bed_but_never_sleep,_have_a_mouth_but_never_eat1551358331.jpg image

A) Forest B) Fire
C) River D) Mountain
 
Answer & Explanation Answer: C) River

Explanation:

River.

It always runs  or flows but never walks.

It will sound like murmuring but never talks.

It has bed but never sleeps.

It has mouth but never eats.

Report Error

View Answer Report Error Discuss

6 3507
Q:

Who is the First Indian to win a medal in badminton at the Olympics ?

Answer

Saina Nehwal

Report Error

View answer Workspace Report Error Discuss

16 3505
Q:

What will be output of following c code?

void main()
{
struct bitfield
{
unsigned a:5;
unsigned c:5;
unsigned b:6;

}bit;
char *p;
struct bitfield *ptr,bit1={1,3,3};
p=&bit1;
p++;
clrscr();
printf("%d",*p);
getch();
}

Answer

Output: 12

Explanation:
Binary value of a=1 is 00001 (in 5 bit)
Binary value of b=3 is 00011 (in 5 bit)
Binary value of c=3 is 000011 (in 6 bit)

In memory it is represented as:
Let address of bit1 is 500 which initialize to char pointer p. Since can is one byte data type so p++ will be 501. *p means content of memory location 501 which is (00001100) and its binary equivalent is 12. Hence output is 12.

Report Error

View answer Workspace Report Error Discuss

Subject: Programming

0 3505
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3505
Q:

When is International Talk Like a Pirate Day is observed?

A) December 11 B) September 16
C) March 8 D) September 19
 
Answer & Explanation Answer: D) September 19

Explanation:
Report Error

View Answer Report Error Discuss

37 3504