Q:

Second and third class levers are differentiated by

A) the location of the load B) the location of the fulcrum
C) the presence of multiple loads D) the type of fulcrum present
 
Answer & Explanation Answer: A) the location of the load

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 3089
Q:

Which of the following is not true about listening?

A) It involves conscious psychological action. B) Attention and meaning given to sounds turns hearing in to listening.
C) It is a passive, constant process. D) It is an active and selective process.
 
Answer & Explanation Answer: C) It is a passive, constant process.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 3089
Q:

As per the Census of 2001, the least urbanised State of India is

A) Arunachal Pradesh B) Assam
C) Himachal Pradesh D) Uttar Pradesh
 
Answer & Explanation Answer: C) Himachal Pradesh

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy

1 3088
Q:

Who is the author of the book " The Argumentative "

A) V.S.Naipaul B) Vikram Seth
C) Sashi Tharoor D) Amartya Sen
 
Answer & Explanation Answer: D) Amartya Sen

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors

3 3087
Q:

A boy multiplied 987 by a certain number and obtained 559981 as his answer. If in the answer both 98 are wrong and the other digits are correct, then the correct answer would be ?? please explain in detail

A) 553681 B) 555181
C) 555681 D) 556581
 
Answer & Explanation Answer: C) 555681

Explanation:
Report Error

View Answer Report Error Discuss

1 3087
Q:

Which of the following Schemes was launched to promote basic education in India and attract children in School going age to attend the classes?

A) Pulse Polio Abhiyan B) Operation Flood
C) Mid-Day Meal Schema D) Operation Black Board
 
Answer & Explanation Answer: C) Mid-Day Meal Schema

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy

2 3086
Q:

In Which state is the highest dam found in India ?

Answer



Tehri Dam on Bhagirathi River in Uttarakhand (Height of 260 meters)


 

Report Error

View answer Workspace Report Error Discuss

4 3085
Q:

What's the role of CMM Level in Testing?

Answer

Capability Maturity Model (CMM) is a model of 5 levels of process 'maturity' that determine effectiveness in delivering quality software. The 5 levels of CMM are described as below:


Level 1: Initial: - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Very few or none of the processes are in place.


Level 2: Repeatable: - Software Project Tracking, Requirements Management, Realistic Planning and Configuration Management Processes are in place; successful practices can be repeated.


Level 3: Defined: - Standard Software Development and Maintenance Processes are integrated throughout an organization. A Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.


Level 4: Managed: - Metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.


Level 5: Optimizing: - The focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.


Any organization can start from any level, but its motto is to reach level 5; where the focus is continuous process improvement. By doing this, high quality s/w delivery is assured.


From this, we can see that the whole essence of CMM or CMMI is to produce quality software. It targets the whole organizational practices (or processes), which are believed to be the best across industries. Testing is part of Quality Assurance. CMM levels play an important role in an organization’s Quality Assurance effort. Thus testing plays an important role in determining CMM level.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 3085