Questions

Q:

Which European ruler had observed 'Bear in mind that the commerce of India is the commerce of the world .... he who can exclusively command it is the dictator of Europe?

A) Queen Victoria B) Peter the Great of Russia
C) Napoleon Bonaparte D) Gustav II Adolf
 
Answer & Explanation Answer: B) Peter the Great of Russia

Explanation:

India was one of the main centres of world trade and industry. Peter the Great of Russia was led to exclaim: “Bear in mind that the commerce of India is the commerce of the world and ... he who can exclusively command it is the dictator of Europe.”

Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: Bank Exams

2 3234
Q:

I can grow quickly and I can die slowly, I can be a terrible pain or a comfort and joy. You never find me all by myself. What am I?

Answer

A relationship.

Report Error

View answer Workspace Report Error Discuss

Subject: Word Puzzles Exam Prep: Bank Exams
Job Role: Bank Clerk

7 3233
Q:

Mirage is due to

A) Magnetic disturbances in the atmosphere B) Equal heating of different parts of the atmosphere
C) Unequal heating of different parts of the atmosphere D) Depletion of ozone layer in the atmosphere
 
Answer & Explanation Answer: C) Unequal heating of different parts of the atmosphere

Explanation:

Mirage_is_due_to1553078535.jpg image

Mirage is a naturally occurring optical phenomenon due to unequal heating of different parts of the atmosphere in which light rays bend to produce a displaced image of distant objects or the sky.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 3233
Q:

The Hydraulic Break works on the principle of _____ ?

A) Pascal's Law B) Boyle's law
C) Coulomb's law D) Bernouli's law
 
Answer & Explanation Answer: A) Pascal's Law

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

11 3232
Q:

Which protocol does ping use?

A) ICMP B) TCP
C) BootP D) ARP
 
Answer & Explanation Answer: A) ICMP

Explanation:

ICMP means Internet Control Message Protocol and is always coupled with the IP protocol (There are 2 ICMP variants one for IPv4 and one for IPv6.) echo request and echo response are the two operation codes of ICMP used to implement ping.

Report Error

View Answer Report Error Discuss

4 3232
Q:

India’s most polluted and least polluted states are

A) Uttarakhand & Rajasthan B) Uttar Pradesh & Kerala
C) New Delhi & Rajasthan D) Uttar Pradesh & Uttarakhand
 
Answer & Explanation Answer: B) Uttar Pradesh & Kerala

Explanation:

Uttar Pradesh is the most polluted state in India, with 15 of its cities among 30 cities with highest levels of toxic air in the country. Prime Minister Narendra Modi’s constituency Varanasi turned out to be the worst polluted city of UP. Countrywide, it came sixth.

Other towns and cities in UP on the list are Hapur, Bareilly, Firozabad, Kanpur, Agra, NOIDA, Allahabad, and Mathura where PM10 levels were way above permissible limits.

Kerala is the least polluted state in the country, India. In all the 14 districts of the state, NAAQ(National Ambient Air Quality Standards) standards are complied with and had lower concentrations of PM10. However, all the cities surpassed the PM10 standards prescribed by WHO.


The report - Airpocalypse II - is based on air pollution related data collected from Central and State Pollution Control Boards and Committees.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 3231
Q:

Project Integration Management

What are the Project Management Processes included in the Project Integration Management?

Answer

The Integrative Project Management Processes include:


Develop Project Charter - Developing the project charter that formally authorizes a project or a project Phase.


Develope Preliminary Project Scope Statement - Developing the preliminary project scope statement that provides a high level scope narrative


Develop Project Management Plan -  Documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans into a project management plan.


Direct and Manage Project Execution- Executing the work defined in the project management plan to achieve the project's requirements defined in the project scope statement.


Monitor and Control Project Work - Monitoring and controlling the processes used to initiate, plan, execute, and close a project to meet the performance objectives defined in the project management plan.


Integrated Change Control - Reviewing all change requests, approving changes, and controlling changes to the deliverables and organizational process assets.


Close Project - Finalizing all activities across all of the Project Management Process Groups to formally close the project or a Project phase.

Report Error

View answer Workspace Report Error Discuss

0 3231
Q:

Chennai-based FMCG company, CavinKare has made an entry into homecare segment by launching a liquid  toilet cleaner. The brand name of the toilet cleaner is

A) Tavex B) Tex
C) Texco D) Domotex
 
Answer & Explanation Answer: B) Tex

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Business Awareness

4 3230