Questions

Q:

Project Risk Management

What are the Project Management Processes included in the Project Risk Management? 

Answer

The Project Risk Management Processes include the following:


Risk Management Planning - Deciding how to approach , plan, and execute the risk management activities for a project


Risk Identification - Determining which risks might affect the project and documenting their characteristics.


Qualitative Risk Analysis - Prioritizing risks for subsequent further analysis or action by assessing and combining their probability of occurrence and impact


Quantitative Risk Analysis - Numerically analyzing the effect on overall project objectives of identified risks


Risk Response Planning - Developing options and actions to enhance opportunities , and to reduce threats to project objectives.


Risk Monitoring and Control - Tracking identified risks, monitoring residual risks, identifying new risks, executing risk response plans, and evaluating their effectiveness throughout the project life cycle.

Report Error

View answer Workspace Report Error Discuss

0 2922
Q:

'Sphinx' is associated with which of the following civilizations?

A) Egyptian Civilization B) Arab Civilization
C) Chinese Civilization D) Roman Civilization
 
Answer & Explanation Answer: A) Egyptian Civilization

Explanation:

The 'sphinx' is a mythological animal with the body of a lion and the head of man. Each Sphinx was carved out of a single solid stone.

Report Error

View Answer Report Error Discuss

Filed Under: World History

0 2921
Q:

In human relations, the irritation threshold is the

A) length of time an annoying behavior continues B) action that causes an annoyance
C) frequency of the annoying behavior D) point at which a person notices something and becomes annoyed
 
Answer & Explanation Answer: D) point at which a person notices something and becomes annoyed

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 2921
Q:

Why is DNA called the blueprint of life?

Answer

DNA is called the blueprint of life because it contains the instructions needed for an organism to grow, develop, survive and reproduce. DNA does this by controlling protein synthesis. Proteins do most of the work in cells, and are the basic unit of structure and function in the cells of organisms.

Report Error

View answer Workspace Report Error Discuss

Subject: Biology Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

2 2921
Q:

Which is the heaviest metal among the following?

A) Gold B) Silver
C) Iron D) Copper
 
Answer & Explanation Answer: A) Gold

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry

1 2920
Q:

Titan industries has rolled out its own Swiss made premium watches in India under the brand Name of 

A) Insignia B) Xylys
C) Bvlgeri D) Titan Sens
 
Answer & Explanation Answer: B) Xylys

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Business Awareness

5 2920
Q:

5 Digits Number?

What 5-digit number has the following features:

If we put the numeral 1 at the beginning, we get a number three times smaller than if we put the numeral 1 at the end of the number.

Answer

We can make an equation:


3(100000 + x) = 10x+1


(Why? Well, adding 100000 puts a 1 at the front of a five-digit number, and multiplying by 10 and adding 1 puts a 1 at the end of a number)


Solving this gives:


10x+1 = 3(100000 + x)
10x+1 = 300000 + 3x
10x = 299999 + 3x
7x = 299999
x = 299999/7 = 42857


The answer is 42857 (142857 is three times smaller than 428571).

Report Error

View answer Workspace Report Error Discuss

9 2920
Q:

The More You Have, The Less You See. What is it?

A) Light B) Darkness
C) Sight D) None
 
Answer & Explanation Answer: B) Darkness

Explanation:

The More You Have the Darkness, The Less You See i.e, visible less.

Report Error

View Answer Report Error Discuss

6 2920