Questions

Q:

Which country is partner country at International Gita Festival 2018 along with India?

A) Spain B) Malaysia
C) Mauritius D) None of the above
 
Answer & Explanation Answer: C) Mauritius

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2133
Q:

Look at the underlined part of each sentence. Below each sentence are given three possible substitutions for the underlined part. If one of them (a), (b) or (c) is better than the underlined part, indicate your response on the Answer Sheet against the corresponding letter. If none of the substitutions imporves the sentence, indicate (d) as your response on the Answer Sheet.

The angry neighbours never passed from each other without making rude remarks.

A) passed on B) passed against
C) passed D) no improvement
 
Answer & Explanation Answer: C) passed

Explanation:

Here ‘passed each other’ means crossed each other’s path. No preposition is required by ‘passed’.

Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2133
Q:

What is the general formula for a straight-chain alkane?

A) C2nH2n+3. B) CnH2n+2
C) CnH2n D) CnH3n+2.
 
Answer & Explanation Answer: B) CnH2n+2

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 2133
Q:

Rearrange the parts of the sentence in correct order.
It is for the government,
P-especially one with such a
Q-significant majority, to have the
R-intelligence and leadership to think long term

A) QRP B) PQR
C) RPQ D) QPR
 
Answer & Explanation Answer: B) PQR

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2133
Q:

Project Life Cycle

What is the Project Life Cycle?

Answer

Project managers or the organization can divide projects into phases to provide better management control with appropriate links to the ongoing operations of the performing organization. Collectively, these phases are known as the project life cycle.

Report Error

View answer Workspace Report Error Discuss

0 2133
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Control ?

Answer

I. Inputs



  • Schedule management plan

  • Schedule baseline

  • Performance reports

  • Approved change requests


II. Tools and Techniques



  • Progress reporting

  • Schedule change control system

  • Performance measurement

  • Project management software

  • Variance analysis

  • Schedule comparision bar charts


III. Outputs



  • Schedule model data (updates)

  • Schedule baseline (updates)

  • Performance measurements

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Activity list (updates)

  • Activity attributes (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2132
Q:

Project Risk Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Qualitative Risk Analysis?

Answer

I. Inputs



  • Organizational process assets

  • Project scope statement 

  • Risk management plan

  • Risk register


II.  Tools and Techniques



  • Risk probability and impact assesment

  • Probability and impact matrix

  • Risk data quality assessment

  • Risk categorization 

  • Risk Urgency assessment


III. Outputs



  • Risk register (updates)

Report Error

View answer Workspace Report Error Discuss

0 2132
Q:

Hydro-electric power provides more than 90% of the total power consumed in 

A) Norway B) Sweden
C) India D) UK
 
Answer & Explanation Answer: A) Norway

Explanation:

The short and swift streams running down the Scandinavian mountains have been harnessed for power which also compensates for the absence of coal and oil.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography

1 2132