Questions

Q:

Explain the concept of the Distributed systems?

Answer

Distributed systems work in a network. They can share the network resources, communicate with each other.

Report Error

View answer Workspace Report Error Discuss

0 2525
Q:

Which physical quantity is measured in 'siemens'?

A) Electric potential B) Electrical conductance
C) Magnetic flux D) Refractive index
 
Answer & Explanation Answer: B) Electrical conductance

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT

3 2525
Q:

Which of the following is a chemical property?

A) Reactivity B) Solubility
C) Density D) All of the above
 
Answer & Explanation Answer: A) Reactivity

Explanation:

The ability of two or more substances to combine to form other substances is called Reactivity.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 2525
Q:

As an infant, the ability to produce antibodies is

A) about 80% of that of an adult B) nonexistent
C) limited D) the same as an adult
 
Answer & Explanation Answer: C) limited

Explanation:

As an infant, the ability to produce antibodies is limited.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

0 2525
Q:

Improve the bracketed part of the sentence.
The student of human history can draw on many more natural experiments (than) just comparisons among the five inhabited continents.

A) to B) of
C) for D) no improvement
 
Answer & Explanation Answer: D) no improvement

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English

0 2524
Q:

What is a software project test plan?

Answer

A test plan is the master document that contains all details pertaining to testing of the application. Its contents include:


 


Testing scope - what is included and what is not included in the testing of the current project 


Assumptions - what are the assumptions that are made for this project 


Milestones - major dates like when testing is going to begin, when it is planned to end, what is the trace review date, what is the production date etc. 


Resources - the resources working on this project along with their contact details 


Defect tracking mechanism - what defect tracking tool will be used, what is the SLA for fixing Critical to Low level IRs etc. 


Test management procedures - who will be notified when there is a critical IR, what reports will be sent daily, if status calls will be held daily or weekly, where will it be held, who is required to join etc. 


Work allocation - resource distribution if more projects are being tested 


Entry and exit criterion - when can a project be accepted for testing (eg. only when smoke testing passes) and when can a project be termed as testing complete (eg. when all testcases are executed and all high level bugs are fixed)

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

3 2524
Q:

The Waterfall with the greatest meterage in the fall is 

A) The Jog Falls, India B) The Victoria Falls, Africa
C) The Niagara Falls, N America D) The Salto Angel Falls, S America
 
Answer & Explanation Answer: D) The Salto Angel Falls, S America

Explanation:

The greatest single drop of the waterfall, Salto Angel of Venezuela, measures 807m and the width at the base is about 150 m. From top to bottom the Angel falls measures 979 m - almost 1 km.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography

2 2523
Q:

The only perennial river in Peninsular India is _____ .

A) Godavari B) Kaveri
C) Krishna D) Bhima
 
Answer & Explanation Answer: B) Kaveri

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: Bank Exams

1 2523