Questions

Q:

The idea of cache memory is based on___.

A) on the heuristic 90-10 rule B) on the property of locality of reference
C) on the fact that references generally tend to cluster D) All options are correct
 
Answer & Explanation Answer: B) on the property of locality of reference

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: Bank Exams

14 2163
Q:

Which of the following statements about water is false?

A) There is extensive intramolecular hydrogen bonding in the condensed phase. B) Water is oxidized to oxygen during photosynthesis.
C) Ice formed by heavy water sinks in normal water. D) Water can act both as an acid and as a base.
 
Answer & Explanation Answer: A) There is extensive intramolecular hydrogen bonding in the condensed phase.

Explanation:

Water possess intermolecular hydrogen bonding in the condensed phase.

 

Hence, the given statement 'There is extensive intramolecular hydrogen bonding in the condensed phase.' about water is FALSE.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

0 2163
Q:

What is the term for classifying and grouping organisms?

A) Homology B) Taxonomy
C) Biology D) Zeology
 
Answer & Explanation Answer: B) Taxonomy

Explanation:

The term for classifying and grouping organisms is Taxonomy. It is the science of defining and naming groups of biological organisms on the basis of shared characteristics.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2163
Q:

Oxygen released during photosynthesis comes from

A) Sugar B) Water
C) Co2 D) Pyruvic acid
 
Answer & Explanation Answer: B) Water

Explanation:

Oxygen released during photosynthesis comes from splitting of water.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2163
Q:

Project Scope Management

What are the Project Management Processes included in the Project Scope Management?

Answer

Scope Planning - Creating a project scope management plan that documents how the project scope will be defined,verified, controlled, and how the work breakdown structure (WBS) will be created and defined.


Scope Definition - Developing a detailed project scope statement as the basis for future project decisions.


Create WBS - Subdividing the major project deliverables and project work into smaller, more manageable components


Scope Verification - Formalizing acceptance of the completed project deliverables.


Scope Control - Controlling changes to the project scope.

Report Error

View answer Workspace Report Error Discuss

0 2163
Q:

The Second World War ended in

Answer

1945 AD

Report Error

View answer Workspace Report Error Discuss

Subject: World History

1 2163
Q:

Hydro-electric power provides more than 90% of the total power consumed in 

A) Norway B) Sweden
C) India D) UK
 
Answer & Explanation Answer: A) Norway

Explanation:

The short and swift streams running down the Scandinavian mountains have been harnessed for power which also compensates for the absence of coal and oil.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography

1 2163
Q:

Molten rock inside the earth is called

A) Mantle B) Core
C) Magma D) Lava
 
Answer & Explanation Answer: C) Magma

Explanation:

Molten rock inside the earth is called Magma.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

5 2162