Questions

Q:

What would be the output of the following program?

main()

{

    int i = -3, j =2, k =0, m ;

    m = ++j && ++i || ++k ;

    Printf ( "\n%d%d%d%d", i , j , k , m );

}

Answer

-2  3  0  1

Report Error

View answer Workspace Report Error Discuss

Subject: Programming

1 2093
Q:

Which one of the following is not a type of coal?

A) Anthracite B) Lignite
C) Peat D) Siderite
 
Answer & Explanation Answer: D) Siderite

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: Bank Exams

4 2093
Q:

Yoga is originated in which country?

A) India B) China
C) Japan D) Germany
 
Answer & Explanation Answer: A) India

Explanation:

Yoga is originated in India during 11th century.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2092
Q:

An image formed by a plane mirror, that cannot be obtained on a screen is called _______.

A) Virtual image B) Real image
C) Inverted image D) Erect image
 
Answer & Explanation Answer: A) Virtual image

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

1 2092
Q:

One turn of the citric acid cycle produces

A) two molecules of carbon dioxide are released B) three molecules of NADH and one molecule of FADH2 are generated
C) one molecule of ATP or GTP is produced D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

One turn of the citric acid cycle produces

 

1. Two molecules of carbon dioxide are released.

2. One molecule of ATP or GTP is produced.

3. Tree molecules of NADH and one molecule of FADH2 are generated.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2092
Q:

What is a ready queue?

Answer

The processes that are residing in the main memory and are ready and waiting to execute are kept on a list called the ready queue.

Report Error

View answer Workspace Report Error Discuss

0 2092
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Estimating ?

Answer

I. Inputs



  • Enterprise environmental factors

  • Organizational process assets 

  • Project scope statement

  • Work breakdown structure

  • WBS dictionary 

  • Project management plan


             - Schedule management plan


             - Staffing management plan


             - Risk register


II. Tools and Techniques



  • Analogous estimating

  • Determine resource cost rates

  • Bottom-up estimating

  • Parametric estimating

  • Project management software

  • Vendor bid analysis

  • Reserve analysis

  • Cost of quality


III. Outputs



  • Activity cost estimates 

  • Activity cost estimate supporting detail 

  • Requested changes

  • Cost management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2092
Q:

Project Time Management

What are the Project Management Processes included in the Project Time Management?

Answer

Activity Definition - Identifying the Specific schedule activities that need to be performed to produce the various project deliverables.


Activity Sequencing - Identifying and documenting dependencies among schedule activities


Activity Resource Estimating - Estimating the type and quantities of resources required to perform each schedule activity


Activity Duration Estimating - Estimating the number of work periods that will be needed to complete individual schedule activities


Schedule Development - Analyzing activity sequences, durations, resource requirements, and schedule constraints to creae the project schedule.


Schedule Control - Controlling changes to the project schedule