Questions

Q:

Which among the following will be a negative ion?

A) If it has more electrons than protons B) If it has more electrons than neutrons
C) If it has more protons than electrons D) If it has more protons than neutrons
 
Answer & Explanation Answer: A) If it has more electrons than protons

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: Bank Exams

1 2154
Q:

What base is found on RNA but not on DNA?

A) Uracil B) Thymine
C) Adenine D) None of the above
 
Answer & Explanation Answer: A) Uracil

Explanation:

Uracil is present in RNA and binds to adenine whereas thymine is present in DNA and binds to adenine.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

5 2154
Q:

A  photon  of  X-ray  has  energy  of  1  keV.  A photon of visible radiation has energy of 3 eV.  In  this  context,  which  one  of  the following statements is not correct?

A) The wavelength of X-ray photon is less than the wavelength of visible radiation photon. B) Both    the    photons    have    different energies.
C) The  speeds  of  both  the  photons  in vacuum are different D) The   frequency   of   X-ray   photon   is higher  than  the  frequency  of  visible radiation photon.
 
Answer & Explanation Answer: C) The  speeds  of  both  the  photons  in vacuum are different

Explanation:

The speed of all the electromagnetic radiation are always   same   and   equal   to   the numerical value 3 x 10^8m/sec.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

0 2154
Q:

Which organization is an interest group?

A) The National Rifle Association B) The National Right to Life organization
C) The National Organization for Women D) All the above
 
Answer & Explanation Answer: D) All the above

Explanation:

An interest group is an organization whose members share common concerns and try to influence government policies affecting those concerns. Interest groups are also known as lobbies.

Report Error

View Answer Report Error Discuss

Filed Under: World Organisations
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

2 2154
Q:

Project Scope Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Scope control ?

Answer

I. Inputs



  • Project scope statement

  • Work breakdown structure

  • WBS dictionary

  • Project scope management plan

  • Performance reports

  • Approved change requests

  • Work performance information


II. Tools and Techniques



  • Change control system

  • Variance analysis

  • Replanning

  • Configuration management system


III. Outputs



  • Project scope statement(updates)

  • Work breakdown structure(updates)

  • WBS dictionary (updates)

  • Scope baseline (updates)

  • Requested changes

  • Recommended  corrective action

  • Organizational process assets (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2154
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Control ?

Answer

I. Inputs



  • Schedule management plan

  • Schedule baseline

  • Performance reports

  • Approved change requests


II. Tools and Techniques



  • Progress reporting

  • Schedule change control system

  • Performance measurement

  • Project management software

  • Variance analysis

  • Schedule comparision bar charts


III. Outputs



  • Schedule model data (updates)

  • Schedule baseline (updates)

  • Performance measurements

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Activity list (updates)

  • Activity attributes (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2154
Q:

Project Life Cycle

What is the Project Life Cycle?

Answer

Project managers or the organization can divide projects into phases to provide better management control with appropriate links to the ongoing operations of the performing organization. Collectively, these phases are known as the project life cycle.

Report Error

View answer Workspace Report Error Discuss

0 2154
Q:

Who has become first Indian player in ODI history to score three consecutive 100s as captain?

A) Virat Kohli B) Rohit Sharma
C) MS Dhoni D) Shikar Dhawan
 
Answer & Explanation Answer: A) Virat Kohli

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2153