Questions

Q:

Which of the following teams have never won the cricket world cup title?

A) Bangladesh B) England
C) South Africa D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

8 2106
Q:

The HAVING clause does which of the following?

A) Acts like a WHERE clause but is used for columns rather than groups B) Acts like a WHERE clause but is used for rows rather than columns
C) Acts EXACTLY like a WHERE clause D) Acts like a WHERE clause but is used for groups rather than rows
 
Answer & Explanation Answer: D) Acts like a WHERE clause but is used for groups rather than rows

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2106
Q:

Afghan-India Friendship Dam is

A) The Zangmu Dam B) Salma Dam
C) Baglihar Dam D) None of the above
 
Answer & Explanation Answer: B) Salma Dam

Explanation:

Afghan-India Friendship Dam is previously called as Salma Dam between India and Afghanistan on Hari river.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

13 2106
Q:

A pure market economy is sometimes called pure

A) Capitalism B) Stocking
C) Sharing D) Socialism
 
Answer & Explanation Answer: A) Capitalism

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2106
Q:

In the question below, there is a word given in bold which is followed by five options. In each of the options, a pair of words is given which is either the pair of synonyms or antonyms or synonym & antonym of the word given in bold. Choose that pair as your answer.

Zealous

A) Droopy, Gigantic B) Tenacity, Assiduity
C) Fervent, Apathetic D) Conceited, Capacious
 
Answer & Explanation Answer: C) Fervent, Apathetic

Explanation:

The meanings of the given words are as follows:
Zealous: having or showing zeal
Droopy: hanging down limply
Gigantic: of very great size or extent; huge or enormous
Tenacity: the quality or fact of being able to grip something firmly; grip
Assiduity: constant or close attention to what one is doing
Fervent: having or displaying a passionate intensity
Apathetic: showing or feeling no interest, enthusiasm, or concern
Conceited: excessively proud of oneself; vain
Capacious: having a lot of space inside; roomy
Hilarity: extreme amusement, especiallywhen expressed by laughter
Livid: furiously angry
Therefore, it can be observed that option C i.e. ‘fervent, apathetic’ forms a synonym- antonym pair of ‘zealous’.

Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: TOEFL , GRE , CAT

0 2105
Q:

In blanking operation clearance is provided on

A) Punch B) Either on punch or die depending upon designer's choice
C) Die D) Half on the punch and half on the die
 
Answer & Explanation Answer: A) Punch

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Hardware
Exam Prep: AIEEE

12 2105
Q:

If an animal is an ectotherm, it has?

A) A skeleton on the inside of its body B) A body that does not produce much internal heat
C) A skeleton on the outside of its body D) A body that regulates its own internal temperature
 
Answer & Explanation Answer: B) A body that does not produce much internal heat

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Animals and Birds
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2105
Q:

Project Communications Management

What are the Project Management Processes included in the Project Communications Management?

Answer

Communications planning - Determining the information and communications needs of the project stakeholders.


Information Distribution - Making needed information available  to project stakeholders in a timely manner.


Performance Reporting - Collecting and distributing performance information. This includes status reporting, progress measurement, and forecasting.


Manage Stakeholders - Managing communications to satisfy the requirements of and resolve issues with project stakeholders.

Report Error

View answer Workspace Report Error Discuss

0 2105