Questions

Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

We set out for the gallows. Two warders marched on either side of the prisoner, with their rifles at the slope; two others marched close against him, gripping him by his arm and shoulder, as though, at once pushing and supporting him. The rest of us, magistrates and the like, followed behind. Suddenly, when we had gone ten yards, the procession stopped short without any order or warning. A dreadful thing had happened ­ a dog, come goodness knows whence, had appeared in the yard. It came bounding among us with a loud volley of barks, and leapt round us wagging its whole body, wild with glee at finding so many human beings together. It was a large woolly dog, half Airedale, half Pariah. For a moment, it pranced round us, and then, before anyone could stop it, it had made a dash for the prisoner, and jumping up tried to lick his face. Everyone stood aghast, too taken aback even to grab at the dog.

What was the emotion displayed by the dog?

A) Fear B) Joy
C) Anger D) Alarm
 
Answer & Explanation Answer: B) Joy

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2101
Q:

Project Management Process Groups

What are the Project Management Process Groups?

Answer

This section identifies and describes the five Project Management Process Groups required for any project. These five process Groups have clear dependencies and are performed in the same sequence on each project.


The five Process Groups are :


Initiating  Process Group - Defines and authorizes the project or a project phase


Planning Process Group - Defines and refines objectives, and plans the course of action required to attain the objectives and scope that the project was undertaken to address.


Executing Process Group - Integrates people and other resources to carry out the project management plan for the project


Monitoring and Controlling process Group - Regularly measures and monitors progress to identify variances from the project management plan so that corrective action can be taken when necessary to meet project objectives.


Closing Process Group - Formalizes acceptance of the product, service or result and brings the project or a project phase to an orderly end.

Report Error

View answer Workspace Report Error Discuss

0 2101
Q:

What are the minimal cost and minimal risk solution?

Answer

In binary representation there are some states that believed to be never occurred due to some particular functionality of a given circuit. If zero output is assigned to such states then it is called minimal risk solution as  we are resetting the formidable states which could be occurred accidentally. Another approach is to assigned a don't care to them so it results in lesser logic and hence is called minimal cost solution.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2101
Q:

Project Communications Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Performance Reporting?

Answer

I. Inputs



  • Work performance information

  • Performance measurements

  • Forecasted completion

  • Quality control measurements

  • Project management plan


                - Performance measurement baseline



  • Approved change requests

  • Deliverables


II. Tools and Techniques



  • Information presentation tools

  • Performance information gathering and compilation

  • Status review meetings

  • Time reporting systems

  • Cost reporting systems


III. Outputs



  • Performance reports

  • Forecasts

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

Report Error

View answer Workspace Report Error Discuss

0 2100
Q:

What is the difference in writing the test cases for Integration testing and system testing?

Answer

Integration testing is done at module level when various modules are integrated with each other to form a system or sub-system. Its main purpose is to ensure that interfaces between various modules are working properly; i.e. modules which are working individually are also working correctly together.


System testing is done on a complete, integrated system to evaluate the system’s compliance with its specified requirements. It validates that the system meets its functional and non-functional requirements.


From these definitions, it is clear that the purpose of Integration and purpose of System Testing are different. Therefore, Integration test cases focus more on the interfaces between modules (interface integrity) - the data transfer and their interaction with each other. System test cases focus on testing the product as a whole; i.e. whether the functional, non-functional requirements of the System are met or not. Since System Testing is the final phase before delivery of the product, System test cases should pinpoint configuration related errors along with testing for performance, security, reliability etc.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 2100
Q:

Volcanoes occur at tectonic plate boundaries that are

A) Convergent B) Divergent
C) Both A & B D) Destructive
 
Answer & Explanation Answer: C) Both A & B

Explanation:

Tectonic plates are pieces of Earth's crust and uppermost mantle, together referred to as the lithosphere. These plates which float on and travel independently over the mantle and much of the earth's seismic activity occurs at the boundaries of these plates.

volcanoes_occur_at_tectonic_plate_boundaries_that_are1561010029.jpg image

The seven major plates are the African plate, Antarctic plate, Eurasian plate, Indo-Australian plate, North American plate, Pacific plate and South American plate.

Volcanoes usually form along plate boundaries , where tectonic plates are either moving towards or away from one another. They may be convergent or divergent.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2100
Q:

A piece of paper is folded and punched as shown in the figure. From the given options, indicate how it will appear when opened?

A) 1 B) 2
C) 3 D) 4
 
Answer & Explanation Answer: B) 2

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2100
Q:

What happens to electrons in an ionic bond?

A) collision of electrons B) Sharing of electrons
C) Both A & B D) Transfer of electrons
 
Answer & Explanation Answer: D) Transfer of electrons

Explanation:

An ionic bond is formed between two molecules when transfer of valency electrons take place between them. 

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2100