Questions

Q:

In the context of memory management, what are placement and replacement algorithms?

Answer

Placement algorithms determine where in available real-memory to load a program. Common methods are first-fit, next-fit, best-fit. Replacement algorithms are used when memory is full, and one process (or part of a process) needs to be swapped out to accommodate a new program. The replacement algorithm determines which are the partitions to be swapped out.

Report Error

View answer Workspace Report Error Discuss

3 3514
Q:

Sponges are most accurately described as

A) marine predators B) chemoautrophs
C) filter feeders D) freshwater scavengers
 
Answer & Explanation Answer: C) filter feeders

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 3514
Q:

Cortisol is secreted by

A) Thyroid gland B) Pituitary gland
C) Adrenal gland D) Parathyroid gland
 
Answer & Explanation Answer: C) Adrenal gland

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology

6 3513
Q:

What is the common name of CaOCl2?

A) Baking Powder B) Baking Soda
C) Bleaching Powder D) Washing Soda
 
Answer & Explanation Answer: C) Bleaching Powder

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: Bank Exams

5 3513
Q:

Who is the First Indian to win a medal in badminton at the Olympics ?

Answer

Saina Nehwal

Report Error

View answer Workspace Report Error Discuss

16 3512
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3512
Q:

Which of the following is regarded by historians as a crucial stage in describing the progress of civilization?

A) Writing B) The discovery of fire
C) Agriculture D) The use of internet
 
Answer & Explanation Answer: C) Agriculture

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History

3 3511
Q:

Which European ruler had observed 'Bear in mind that the commerce of India is the commerce of the world .... he who can exclusively command it is the dictator of Europe?

A) Queen Victoria B) Peter the Great of Russia
C) Napoleon Bonaparte D) Gustav II Adolf
 
Answer & Explanation Answer: B) Peter the Great of Russia

Explanation:

India was one of the main centres of world trade and industry. Peter the Great of Russia was led to exclaim: “Bear in mind that the commerce of India is the commerce of the world and ... he who can exclusively command it is the dictator of Europe.”

Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: Bank Exams

2 3511