Questions

Q:

Kargil Fight held in

A) 1979 B) 1989
C) 1999 D) 1969
 
Answer & Explanation Answer: C) 1999

Explanation:

The Kargil War, also known as the Kargil conflict, was an armed conflict between India and Pakistan that took place between May and July 1999 in the Kargil district of Kashmir and elsewhere along the Line of Control (LOC). In India, the conflict is also referred to as Operation Vijay.

Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 3133
Q:

How long does a basketball game last?

A) 35 min B) 55 min
C) 1 hr 15 min D) 48 min
 
Answer & Explanation Answer: D) 48 min

Explanation:

A basketball game last for a total of 48 minutes which has 4 quarters of 12 minutes each excluding all timeouts, 15 min half time, fouls,...

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank PO

9 3133
Q:

Solve the values?

solve_puzzle1547893377.jpg image

A) P=0, Q=8, R=1 B) P=0, Q=9, R=1
C) P=1, Q=9, R=0 D) P=0, Q=9, R=0
 
Answer & Explanation Answer: D) P=0, Q=9, R=0

Explanation:

By trial and error method,

P=0, Q=9, R=0 satisfies the values.

Report Error

View Answer Report Error Discuss

Filed Under: Math Puzzles
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank Clerk , Bank PO

7 3132
Q:

What's the role of CMM Level in Testing?

Answer

Capability Maturity Model (CMM) is a model of 5 levels of process 'maturity' that determine effectiveness in delivering quality software. The 5 levels of CMM are described as below:


Level 1: Initial: - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Very few or none of the processes are in place.


Level 2: Repeatable: - Software Project Tracking, Requirements Management, Realistic Planning and Configuration Management Processes are in place; successful practices can be repeated.


Level 3: Defined: - Standard Software Development and Maintenance Processes are integrated throughout an organization. A Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.


Level 4: Managed: - Metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.


Level 5: Optimizing: - The focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.


Any organization can start from any level, but its motto is to reach level 5; where the focus is continuous process improvement. By doing this, high quality s/w delivery is assured.


From this, we can see that the whole essence of CMM or CMMI is to produce quality software. It targets the whole organizational practices (or processes), which are believed to be the best across industries. Testing is part of Quality Assurance. CMM levels play an important role in an organization’s Quality Assurance effort. Thus testing plays an important role in determining CMM level.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 3132
Q:

Study of inter relationship between living organism and their environment is called _______

A) Plant Geography B) Plant social science
C) Ecology D) Ecosystem
 
Answer & Explanation Answer: C) Ecology

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology

4 3132
Q:

What is the freezing point of water in Celsius?

A) 0 deg C B) 32 deg C
C) -42 deg C D) -32 deg C
 
Answer & Explanation Answer: A) 0 deg C

Explanation:

The freezing point of water and melting point is 0 °C or 32 °F. The temperature may be lower if supercooling occurs.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk

0 3131
Q:

Who wrote the line: ' A thing of beauty is a joy for ever '

A) P.B.Shelley B) William Wordsworth
C) John Keats D) Robert Browning
 
Answer & Explanation Answer: C) John Keats

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors

1 3131
Q:

Jamini Roy was a famous

A) Actor B) Producer
C) Dancer D) Painter
 
Answer & Explanation Answer: D) Painter

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Famous Personalities

1 3131