Questions

Q:

In the given question, a statement divided into different segments is given. The first segment is fixed, rearrange the other segments to form a coherent statement.

It was hard for the Afghans/ leading to the subtle plummeting of the morale (P)/ to withstand the wave after wave of enemy attacks (Q)/ their plight further worsened the situation (R)/ and the indifference of the allies towards (S)

A) QSRP B) PQRS
C) RQPS D) SRPQ
 
Answer & Explanation Answer: A) QSRP

Explanation:

Clearly, only segment Q fits after the first segment. This eliminates all the options except 1.

Option 2: It is incorrect because it ends in S which ends in 'towards' which can't be used to any statement.

Option 3: It is incorrect for the same reason as option 2.

Option 4: 'towards their plight further worsened' makes no sense; hence it can be eliminated.

Option 5: R is a clear misfit after the first segment; hence it can also be eliminated. Hence, the correct sequence is QSRP.

Report Error

View Answer Report Error Discuss

Filed Under: English

0 4234
Q:

Nobel Prize is established in  ?

A) 1931 B) 1911
C) 1901 D) 1951
 
Answer & Explanation Answer: C) 1901

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: CAT , Bank Exams

8 4233
Q:

Which Bank has become the first bank in India to launch DigiPOS, a Point of Sale (POS) machine ?

A) Yes Bank B) HDFC Bank
C) ICICI Bank D) SBI
 
Answer & Explanation Answer: B) HDFC Bank

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

4 4230
Q:

I have four fingers and a thumb, but not alive.

Who am I?

Answer

A glove. It has 5 fingers as we have but not alive.

Report Error

View answer Workspace Report Error Discuss

Subject: Logic Puzzles Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

2 4230
Q:

The command center of fluid intake is located in the

A) Hypothalamus B) Adrenal glands
C) Kidneys D) None of the above
 
Answer & Explanation Answer: A) Hypothalamus

Explanation:

The command center of fluid intake is located in the Hypothalamus.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 4230
Q:

What is CPC  ?

A) Central Person scheme B) Central Pay commission
C) Central Paid determination D) Central Pay scheme
 
Answer & Explanation Answer: B) Central Pay commission

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

6 4227
Q:

A cavern is an underground chamber formed by

A) Erosion B) Runoff
C) Deposition D) Evaporation
 
Answer & Explanation Answer: A) Erosion

Explanation:

Caverns are openings in the ground. Some famous caverns in the United States are Mammoth Cave, Carlsbad Caverns, Wind Cave, and Luray Caverns.

 

When rainwater trickles down through the soil, it carries carbon dioxide from the air with it. This turns acidic as it moves through the soil, joining with carbon from decaying plants. This acidic rainwater then eats away at, or erodes, the rock under the ground, forming a cave or cavern. For this process to occur, the rock must be the right type; limestone, dolomite, and gypsum are common.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 4226
Q:

An important tool for project scope management is

A) Fast tracking B) Work breakdown structure
C) Crashing D) A Gantt Chart
 
Answer & Explanation Answer: B) Work breakdown structure

Explanation:

Work breakdown structure is an important tool for project scope management.

 

Project Scope Management refers to the set of processes that ensure a project’s scope is accurately defined and mapped. Scope Management techniques enable project managers and supervisors to allocate just the right amount of work necessary to successfully complete a project—concerned primarily with controlling what is and what is not part of the project’s scope.

Report Error

View Answer Report Error Discuss

14 4224