Questions

Q:

Which State is the "most corrupt state" According to the National Crime Records Bureau (NCRB)?

A) Manipur B) Maharashtra
C) Himachal Pradesh D) Uttarakhand
 
Answer & Explanation Answer: B) Maharashtra

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk

6 3114
Q:

Solid Carbon dioxide is known as

A) Wet Ice B) Dry Ice
C) Solid Ice D) None
 
Answer & Explanation Answer: B) Dry Ice

Explanation:

Dry ice or Cardice is the solid form of Carbon dioxide.

 

1. It has an advantage of lower temperature than the water ice and doesn't leave any residue.

 

2. The reason why it is called as Dry ice is because unlike the normal ice, it won't melt into liquid form. It directly evaporates into the air as gas. That is Solid to gas form passing through liquid state is a phenomenon called as Sublimation.

 

3. The primary use of dry ice is as cooling agent.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

5 3114
Q:

Which country is going to launch the world's first nuclear power plant (Sanmen Nuclear Power Station) that is immune to meltdown ?

A) India B) USA
C) China D) Russia
 
Answer & Explanation Answer: C) China

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

5 3114
Q:

What's the role of CMM Level in Testing?

Answer

Capability Maturity Model (CMM) is a model of 5 levels of process 'maturity' that determine effectiveness in delivering quality software. The 5 levels of CMM are described as below:


Level 1: Initial: - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Very few or none of the processes are in place.


Level 2: Repeatable: - Software Project Tracking, Requirements Management, Realistic Planning and Configuration Management Processes are in place; successful practices can be repeated.


Level 3: Defined: - Standard Software Development and Maintenance Processes are integrated throughout an organization. A Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.


Level 4: Managed: - Metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.


Level 5: Optimizing: - The focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.


Any organization can start from any level, but its motto is to reach level 5; where the focus is continuous process improvement. By doing this, high quality s/w delivery is assured.


From this, we can see that the whole essence of CMM or CMMI is to produce quality software. It targets the whole organizational practices (or processes), which are believed to be the best across industries. Testing is part of Quality Assurance. CMM levels play an important role in an organization’s Quality Assurance effort. Thus testing plays an important role in determining CMM level.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 3114
Q:

Finger like ends of the fallopian tubes are called

A) Fimbriae B) Cysts
C) Papillae D) Labia
 
Answer & Explanation Answer: A) Fimbriae

Explanation:

The fimbriae of the uterine tube, also known as fimbriae tubae, are small, fingerlike projections at the end of the fallopian tubes, through which eggs move from the ovaries to the uterus.

The fimbriae are connected to the ovary.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank PO

4 3114
Q:

One of the main issues discussed in the 40th Ministrial Meeting of the ASEAN held in August, 2007 was 

A) America's overstay in Iraq B) Presidential Election in Pakistan
C) Draft blueprint of the ASEAN Charter D) The 123 Agreement between India and USA
 
Answer & Explanation Answer: C) Draft blueprint of the ASEAN Charter

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams
Job Role: Bank PO

1 3113
Q:

Which elements are malleable and good conductors of electricity?

A) tin and silver B) iodine and silver
C) tin and xenon D) iodine and xenon
 
Answer & Explanation Answer: A) tin and silver

Explanation:

Tin and Silver are malleable and good conductors of electricity. The other combinations have a non metal in them which are bad conductors.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 3113
Q:

Which Greek statesman is called 'the father of democracy'?

Answer

Pericles

Report Error

View answer Workspace Report Error Discuss

0 3112