Questions

Q:

Who has become the 1st Indian transgender to be honoured with Padma Shri?

A) Kalki Subramaniam B) Madhu Kinnar
C) Narthaki Nataraj D) Rudrani Chettri
 
Answer & Explanation Answer: C) Narthaki Nataraj

Explanation:

Narthaki Nataraj has become the 1st Indian transgender to be honoured with Padma Shri.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2145
Q:

A floppy disk contains

A) Sectors only B) Circular tracks only
C) Both A & B D) None of the above
 
Answer & Explanation Answer: C) Both A & B

Explanation:

A floppy disk contains both circular tracks and sectors in it.

Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2145
Q:

Select the antonym of
mishmash

A) potpourri B) medley
C) organized D) haphazard
 
Answer & Explanation Answer: C) organized

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2145
Q:

Who is the author of the book 'Central Time'.

Answer

Ranjit Hoskote

Report Error

View answer Workspace Report Error Discuss

3 2144
Q:

Length of two trains are 150 m and 200 m respectively and the ratio (shorter: longer) of their speed is 2 : 5. If they cross each other in opposite direction in 15 second then in what time faster train will overtake the slower train.

A) 20 seconds B) 25 seconds
C) 32 seconds D) 35 seconds
 
Answer & Explanation Answer: D) 35 seconds

Explanation:

Let speed of slower train = 2x
⇒ speed of faster train = 5x
ATQ, (150 + 200)/(2x + 5x) = 15
x = 10/3
Time required=350/[50/3–20/3]= 35 seconds

Report Error

View Answer Report Error Discuss

0 2144
Q:

Project Scope Management

What are the Project Management Processes included in the Project Scope Management?

Answer

Scope Planning - Creating a project scope management plan that documents how the project scope will be defined,verified, controlled, and how the work breakdown structure (WBS) will be created and defined.


Scope Definition - Developing a detailed project scope statement as the basis for future project decisions.


Create WBS - Subdividing the major project deliverables and project work into smaller, more manageable components


Scope Verification - Formalizing acceptance of the completed project deliverables.


Scope Control - Controlling changes to the project scope.

Report Error

View answer Workspace Report Error Discuss

0 2144
Q:

Which period in history, is known as '100 days'?

Answer

The interval of time between Napoleon's escape from Elba and his abdication after the Battle of Waterloo

Report Error

View answer Workspace Report Error Discuss

Subject: World History

1 2144
Q:

Which among the following statements about the earth , is not true?

A) The Earth makes one complete revolution round the Sun every 365 d, 5h, 48m, and 46 s B) The Earth makes one complete revolution on its axis in 48 hours
C) The Earth revolves in its orbit round the at a speed 66,000 miles per hour D) The Earth rotates on its axis at an equatorial speed of more than 1000 miles per hour
 
Answer & Explanation Answer: B) The Earth makes one complete revolution on its axis in 48 hours

Explanation:

Earth rotates on its own axis and completes one rotation in 24 hours

Report Error

View Answer Report Error Discuss

Filed Under: World Geography

1 2144