Questions

Q:

Which step happens first in DNA replication?

A) Initiation B) Elongation
C) Termination D) None of the above
 
Answer & Explanation Answer: A) Initiation

Explanation:

In the first step of DNA replication called initiation, the DNA pair gets unwidened.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

1 2078
Q:

Improve the bracketed part of the sentence.
All the allegations levelled (over) the poor watchman were found to be baseless.

A) upon B) off
C) against D) no improvement
 
Answer & Explanation Answer: C) against

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2078
Q:

The First battle of which war was the Battle of Alma?

A) Creek war B) Crimean war
C) Korean war D) Chinese war
 
Answer & Explanation Answer: B) Crimean war

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World History

2 2078
Q:

Project Time Management

What are the Project Management Processes included in the Project Time Management?

Answer

Activity Definition - Identifying the Specific schedule activities that need to be performed to produce the various project deliverables.


Activity Sequencing - Identifying and documenting dependencies among schedule activities


Activity Resource Estimating - Estimating the type and quantities of resources required to perform each schedule activity


Activity Duration Estimating - Estimating the number of work periods that will be needed to complete individual schedule activities


Schedule Development - Analyzing activity sequences, durations, resource requirements, and schedule constraints to creae the project schedule.


Schedule Control - Controlling changes to the project schedule

Report Error

View answer Workspace Report Error Discuss

0 2078
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Estimating ?

Answer

I. Inputs



  • Enterprise environmental factors

  • Organizational process assets 

  • Project scope statement

  • Work breakdown structure

  • WBS dictionary 

  • Project management plan


             - Schedule management plan


             - Staffing management plan


             - Risk register


II. Tools and Techniques



  • Analogous estimating

  • Determine resource cost rates

  • Bottom-up estimating

  • Parametric estimating

  • Project management software

  • Vendor bid analysis

  • Reserve analysis

  • Cost of quality


III. Outputs



  • Activity cost estimates 

  • Activity cost estimate supporting detail 

  • Requested changes

  • Cost management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2078
Q:

What's the maximum hard drive size for FAT16-based Windows system?

Answer

Maximum hard drive size for FAT16-based windows system is 2GB.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2077
Q:

Which error are you likely to get when you run the following program?

main()

{

  struct emp

  {

      char name[20];

      float sal;

  };

  struct emp e[10];

  int i;

  for ( i = 0 ; i <= 9; i++)

        scanf ( "%s %f" , e[i].name, &e[i].sal );

}

Answer

Floating point formats not linked

Report Error

View answer Workspace Report Error Discuss

Subject: Programming

0 2077
Q:

What is process synchronization?

Answer

A situation, where several processes access and manipulate the same data concurrently and the outcome of the execution depends on the particular order in which the access takes place, is called race condition. To guard against the race condition we need to ensure that only one process at a time can be manipulating the same data. The technique we use for this is called process synchronization.

Report Error

View answer Workspace Report Error Discuss

1 2077