Questions

Q:

In economics, the cost of something is

A) the dollar amount of obtaining it B) what you give up to get it
C) often impossible to quantify, even in principle D) always measured in units of time given up to get it
 
Answer & Explanation Answer: B) what you give up to get it

Explanation:

In economics, the cost of something is what you give up to get it.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2114
Q:

With YouTube Analytics, you can track metrics on

A) TrueView ad skip rates B) Playback locations
C) Cost-per-channel visit D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

With YouTube Analytics, you can track metrics on Playback locations. Playback locations gives you how many views your channel got and what videos they watched. 

 

With_YouTube_Analytics,_you_can_track_metrics_on1554273173.jpg image

 

With YouTube Analytics we can Find out who's watching, what they like to watch, and which videos could make you the most money.

Report Error

View Answer Report Error Discuss

4 2114
Q:

How do you differentiate the roles of Quality Assurance Manager and Project Manager?

Answer

Quality Assurance Manager (QA Manager) defines the process to be followed at each phase of SDLC. He defines the standards to be followed, the documents to be maintained and sets the standard for the product.


Where as it is the Project Manager’s responsibility to ensure that the things defined by QA manager are being implemented. He develops the product from start to finish with his team and ensures that the product which is to be rolled out is Defect free and it reaches the standards and views defined by QA Manager.


QA managers can audit the process for certain time periods which are being handled by the Project Manager.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

0 2114
Q:

Project Communications Management

What are the Project Management Processes included in the Project Communications Management?

Answer

Communications planning - Determining the information and communications needs of the project stakeholders.


Information Distribution - Making needed information available  to project stakeholders in a timely manner.


Performance Reporting - Collecting and distributing performance information. This includes status reporting, progress measurement, and forecasting.


Manage Stakeholders - Managing communications to satisfy the requirements of and resolve issues with project stakeholders.

Report Error

View answer Workspace Report Error Discuss

0 2114
Q:

What are the minimal cost and minimal risk solution?

Answer

In binary representation there are some states that believed to be never occurred due to some particular functionality of a given circuit. If zero output is assigned to such states then it is called minimal risk solution as  we are resetting the formidable states which could be occurred accidentally. Another approach is to assigned a don't care to them so it results in lesser logic and hence is called minimal cost solution.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2113
Q:

What is the difference in writing the test cases for Integration testing and system testing?

Answer

Integration testing is done at module level when various modules are integrated with each other to form a system or sub-system. Its main purpose is to ensure that interfaces between various modules are working properly; i.e. modules which are working individually are also working correctly together.


System testing is done on a complete, integrated system to evaluate the system’s compliance with its specified requirements. It validates that the system meets its functional and non-functional requirements.


From these definitions, it is clear that the purpose of Integration and purpose of System Testing are different. Therefore, Integration test cases focus more on the interfaces between modules (interface integrity) - the data transfer and their interaction with each other. System test cases focus on testing the product as a whole; i.e. whether the functional, non-functional requirements of the System are met or not. Since System Testing is the final phase before delivery of the product, System test cases should pinpoint configuration related errors along with testing for performance, security, reliability etc.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 2113
Q:

Which of the following is called the 'Gateway of the Pacific'?

A) Gulf of Alaska B) Panama Canal
C) Suez Canal D) Bering Sea
 
Answer & Explanation Answer: B) Panama Canal

Explanation:

Panama Canal is called the 'Gateway of the Pacific'.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2113
Q:

Rate at which velocity changes over time?

A) Speed B) Displacement
C) Acceleration D) Jerk
 
Answer & Explanation Answer: C) Acceleration

Explanation:

Acceleration is nothing but the rate at which velocity changes over time.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

7 2113