Questions

Q:

Programs stored in ROM are called

A) Firmware B) Software
C) Hardware D) None of above
 
Answer & Explanation Answer: A) Firmware

Explanation:

ROM stands for read-only-memory.

 

It's used to store the start-up instructions for a computer, also known as the firmware.

 

Most modern computers use flash-based ROM. It is part of the BIOS chip, which is located on the motherboard.

Report Error

View Answer Report Error Discuss

4 3446
Q:

The 2014-2015 interim budget implemented a subcharge of 10 percent on super-rich people who have having income above how much rupees in a financial year?

A) 50 Lakhs B) 1 Crore
C) 2 Crore D) 3 Crore
 
Answer & Explanation Answer: B) 1 Crore

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Job Role: Bank PO

5 3446
Q:

Which of the following became widespread during the 1980's?

A) Internet B) Radio
C) Cable television D) All the above
 
Answer & Explanation Answer: C) Cable television

Explanation:

Cable television or cable TV became widespread during the 1980's.

Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

6 3446
Q:

When more than 20% of the body weight is due to fat, the person is suffering from

A) Marasmus B) Kwashiorkor
C) Scurvy D) Obesity
 
Answer & Explanation Answer: D) Obesity

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology

5 3446
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3445
Q:

Who was the first englishman to sail around the world?

A) Magellan B) Sir Francis Drake
C) Juan Sebastian Elcano D) Henry Hudson
 
Answer & Explanation Answer: B) Sir Francis Drake

Explanation:

Sir Francis Drake was the first Englishman to sail around the world.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

2 3445
Q:

What separates the components of a domain name?

A) apostrophes B) periods
C) spaces D) commas
 
Answer & Explanation Answer: B) periods

Explanation:
Report Error

View Answer Report Error Discuss

5 3444
Q:

"Kargil Vijay Diwas" was observed on _____.

A) 26 July B) 27 July
C) 25 July D) 29 July
 
Answer & Explanation Answer: A) 26 July

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Important Days and Years
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

5 3444